What's changing near PO9 2TN
Within 2 km, around Central Havant & Langstone in Havant. Building, planning, schools, transport, prices and crime.
53new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.0%like-for-like prices in Central Havant & Langstone, 2024 → 2025 (council +0.3%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
20 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
1.9 km away - New homes
24 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.9 km away - New homes
6 new homes completedflats · Jun 2025
Jun 2025
1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
14homes extended 2021–2025, typically adding 31 m²
26since energy certificates began (2008)
1in PO9 2TN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
10hours of spills in 2025 between them (typical neighbourhood: about 36)
2spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 7 running (76 MW between them). Those within 5 km are on the map above.
- Battery storage
Bedhampton Pumping Station, Meyrick Road - Battery Energy StoragePlanning application in · 150 MW
May 2025
850 m away - Solar farm
Palk Road, Bedhampton - Solar PanelsApproved, not yet built · 250 kW
Jan 2022
2.1 km away - Rooftop solar
Spire Portsmouth Hospital, Bartons Road - Solar Pv PanelsApproved, not yet built · 150 kW
Apr 2024
2.4 km away - Rooftop solar
Dunsbury Park, Fitzwygram Way - Solar PanelsApproved, not yet built · 1 MW
Jun 2024
4.2 km away - Solar farm
Farlington Water Treatment Works, Gillman Road - Solar PanelsApproved, not yet built · 4 MW
Nov 2022
4.3 km away - Solar farm
Baker Barracks Solar DevelopmentApproved, not yet built · 2 MW
Feb 2021
4.4 km away - Rooftop solar
Harwin Engineers - Solar PanelsApproved, not yet built · 890 kW
May 2026
5.0 km away - Rooftop solar
Sainsburys, Fitzherbert Road - Solar PanelsApproved, not yet built · 540 kW
Feb 2025
5.1 km away - Rooftop solar
Phoenix Healthcare, Jackson Close - Solar PanelsApproved, not yet built · 240 kW
Mar 2025
5.4 km away - Rooftop solar
SGN, Walton Park - Solar PanelsApproved, not yet built · 290 kW
Feb 2023
5.8 km away
Road and street works within 1 km
9 permitted works running now or planned, 7 of them major.
- Major, planned
Emsworth Road, HavantUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Nov 2026
250 m away - Major
Emsworth Road, HavantUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Nov 2026
250 m away - Major
Oaklands Road, HavantUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Dec 2026
500 m away - Major
Connaught Road, HavantUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Nov 2026 to Dec 2026
600 m away - Major
Bellair Road, HavantUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Aug 2026 to Oct 2026
600 m away - Major
Orchard Road, HavantUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Oct 2026
750 m away - Major
South Street, HavantUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 2026
1000 m away - Standard
Emsworth Road, HavantHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026
100 m away - Minor
Bellair Road, HavantUtility repair and maintenance works · BT · Some carriageway incursion
Nov 2026 to Nov 2026600 m away
Major infrastructure projects within 30 km
- Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
9.1 km away - Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
13.1 km away - Decideddecided Apr 2025
29.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Southleigh Landfill (landfill gas, 2.4 km); Portsmouth ERF (energy from waste, 6.7 km); Lovedean Farm (solar farm, 8.4 km); Broadley Copse (anaerobic digestion, 8.8 km); Paulsgrove Landfill Site (landfill gas, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.