Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
10 planned, approved or being built and 4 running (57 MW between them). Those within 5 km are on the map above.
Solar farm
Lovedean, Denmead - Solar farm & Battery storagePlanning application in · 50 MW
Mar 2022 4.0 km away
Battery storage
Lovedean, Denmead - Solar farm & Battery storagePlanning application in
Mar 2022 4.0 km away
Rooftop solar
Dunsbury Park, Fitzwygram Way - Solar PanelsApproved, not yet built · 1 MW
Jun 2024 6.6 km away
Rooftop solar
Reeves Britannia, The Causeway - Solar PV panelsApproved, not yet built · 160 kW
Dec 2024 7.7 km away
Rooftop solar
Whitewool Farm, East Meon - Solar PanelsApproved, not yet built · 160 kW
May 2024 7.7 km away
Rooftop solar
The New Barn, Bedford Road - Solar PanelsApproved, not yet built · 170 kW
Dec 2022 7.8 km away
Rooftop solar
Spire Portsmouth Hospital, Bartons Road - Solar Pv PanelsApproved, not yet built · 150 kW
Apr 2024 8.1 km away
Solar farm
Palk Road, Bedhampton - Solar PanelsApproved, not yet built · 250 kW
Jan 2022 9.4 km away
Battery storage
Bedhampton Pumping Station, Meyrick Road - Battery Energy StoragePlanning application in · 150 MW
May 2025 9.4 km away
Solar farm
Farlington Water Treatment Works, Gillman Road - Solar PanelsApproved, not yet built · 4 MW
Nov 2022 9.8 km away
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
Major
Drift Road, WaterloovilleRemedial works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Nov 2026 500 m away
Standard
Green Lane, WaterloovilleRemedial works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Oct 2026 350 m away
Minor
St James Close, WaterloovilleUtility asset works · PORTSMOUTH WATERWORKS COMPANY · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away
Minor
Drift Road, WaterloovilleHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation.
application due Q4 2019 3.9 km away
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 13.4 km away
Decided
M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Clanfield & Finchdean: +20% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.3% in two years.