Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
6 permitted works running now or planned, 2 of them major.
Major
Drift Road, WaterloovilleRemedial works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Nov 2026 950 m away
Major, planned
South Lane, WaterloovilleHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 1000 m away
Standard
Green Lane, WaterloovilleRemedial works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Oct 2026 800 m away
Minor
St James Close, WaterloovilleUtility asset works · PORTSMOUTH WATERWORKS COMPANY · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
Minor
Chalton Lane, WaterloovilleHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 900 m away
Minor
Drift Road, WaterloovilleHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation.
application due Q4 2019 4.3 km away
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 13.8 km away
Decided
M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Clanfield & Finchdean: +20% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.3% in two years.