2new homes completed within 2 km, last 2 years
83homes given permission on brownfield sites since 2021
-1.4%like-for-like prices in Paulsgrove West & Port Solent, 2024 → 2025 (council +0.7%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionJan 2023
1.5 km away - Planning permissionFeb 2022
1.5 km away - Planning permissionJun 2021
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 22 m²
20since energy certificates began (2008)
1in PO6 4SG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
1hours of spills in 2025 between them (typical neighbourhood: about 36)
1spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
46 planned, approved or being built and 7 running (131 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Castle View Academy, Allaway Avenue - Solar PanelsApproved, not yet built · 180 kW
Jun 2026
150 m away - Rooftop solar
Trafalgar Wharf Hamilton Road - Solar PanelsApproved, not yet built · 700 kW
May 2022
900 m away - Rooftop solar
Lakeside Business ParkBeing built · 5 MW
Aug 2023
2.2 km away - Battery storage
Lakeside Business ParkBeing built · 2 MW
Aug 2023
2.2 km away - Rooftop solar
Queen Alexandra Hospital, Southwick Hill Road - Solar PanelsApproved, not yet built · 870 kW
Jan 2026
2.3 km away - Rooftop solar
Queen Alexandra Hospital, Southwick Hill Road - Solar CanopyApproved, not yet built · 540 kW
Feb 2026
2.3 km away - Battery storage
Fort Widley, Portsdown Hill Road - Battery Energy Storage SystemPlanning application in · 120 MW
Jul 2025
2.9 km away - Rooftop solar
Mountbatten Centre, Twyford Avenue - Solar PanelsApproved, not yet built · 270 kW
May 2023
2.9 km away - Rooftop solar
Warehouse, Gunstore Road - Solar PanelsApproved, not yet built · 180 kW
Jan 2023
3.5 km away - Rooftop solar
Venture Park, Limberline Road - Solar PanelsPlanning application in
May 2026
3.5 km away
Road and street works within 1 km
5 permitted works running now or planned, 4 of them major.
- Major
Watersedge Road, PortsmouthHighway repair and maintenance works · PORTSMOUTH CITY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
100 m away - Major
Southampton Road, PortsmouthOptional permit (no fee) e.g. for traffic management etc · PORTSMOUTH CITY COUNCIL · Lane closure
Oct 2026 to Oct 2026
100 m away - Major, planned
Southampton Road, PortsmouthUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Lane closure
Nov 2026 to Dec 2026
650 m away - Major
Southampton Road, PortsmouthUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Lane closure
Nov 2026 to Dec 2026
650 m away - Minor
Southampton Road, PortsmouthUtility repair and maintenance works · PORTSMOUTH CITY COUNCIL · Contra-flow
Nov 2026 to Nov 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
4.1 km away - Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
8.9 km away - Decideddecided May 2024
28.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Paulsgrove Landfill Site (landfill gas, 1.4 km); MMD Shipping Services (rooftop solar, 4.3 km); Southwick Estate (solar farm, 4.4 km); Portsmouth ERF (energy from waste, 4.5 km); Newlands Farm Battery Storage Facility Phase 2 (battery storage, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.