What's changing near PO4 9BT
Within 2 km, around Southsea Haslemere Road in Portsmouth. Building, planning, schools, transport, prices and crime.
206new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.5%like-for-like prices in Southsea Haslemere Road, 2024 → 2025 (council +0.7%)
-11%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
39 new homes completedflats · Mar 2026 – Sep 2026
Sept 2026
1.7 km away - New homes
22 new homes completed1 flats, 21 houses · Jan 2025 – Jun 2026
Jun 2026
1.5 km away - New homes
50 new homes completed30 flats, 20 houses · May 2025 – May 2026
May 2026
1.4 km away - New homes
6 new homes completedhouses · Feb 2026
Feb 2026
550 m away - New homes
29 new homes completedflats · Aug 2025 – Jan 2026
Jan 2026
1.2 km away - New homes
6 new homes completed2 flats, 4 houses · Mar 2025 – Nov 2025
Nov 2025
1.4 km away - New homes
12 new homes completedflats · Sep 2025
Sept 2025
1.6 km away - New homes
5 new homes completedflats · Feb 2025
Feb 2025
1.2 km away - New homes
7 new homes completedflats · Nov 2024
Nov 2024
1.5 km away - New homes
8 new homes completedhouses · Oct 2024
Oct 2024
450 m away - School closed
School closed: St John's CollegeOther independent school, other independent school (closure)
Aug 2022
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 22 postcodes nearby had new homes completed in the last two years.
51homes extended 2021–2025, typically adding 24 m²
113since energy certificates began (2008)
1in PO4 9BT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
32 planned, approved or being built and 4 running (25 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Big Yellow Self Storage, Rodney Road - Solar PanelsApproved, not yet built · 170 kW
Oct 2022
1.2 km away - Rooftop solar
St Marys Hospital, Milton Road -Solar PanelsPlanning application in · 460 kW
Dec 2025
1.4 km away - Rooftop solar
St Marys Hospital, Milton Road - Solar PanelsApproved, not yet built · 460 kW
Mar 2026
1.4 km away - Battery storage
St James Hospital Solent Nhs Trust, Locksway Road - Energy CentreApproved, not yet built
Dec 2022
1.5 km away - Rooftop solar
Ark Charter Academy, Hyde Park Road - Solar PanelsApproved, not yet built · 160 kW
Jul 2025
1.8 km away - Rooftop solar
Gunwharf Quays Shopping Centre - Solar PanelsApproved, not yet built · 640 kW
Jun 2023
3.0 km away - Rooftop solar
Portsmouth International Port - Solar PanelsBeing built · 1 MW
Jun 2023
3.1 km away - Rooftop solar
David Lloyd Club, The Boardwalk - Solar PanelsApproved, not yet built · 270 kW
Oct 2023
3.4 km away - Rooftop solar
Mountbatten Centre, Twyford Avenue - Solar PanelsApproved, not yet built · 270 kW
May 2023
4.3 km away - Rooftop solar
Walpole Road - Solar PanelsApproved, not yet built · 160 kW
Dec 2022
4.4 km away
Road and street works within 1 km
32 permitted works running now or planned, 20 of them major.
- Major, planned
Reginald Road, SouthseaUtility repair and maintenance works · SOUTHERN WATER · Road closure
Nov 2026 to Nov 2026
200 m away - Major
Pretoria Road, SouthseaHighway repair and maintenance works · PORTSMOUTH CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
250 m away - Major
Pretoria Road, SouthseaUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Road closure
Jan 2027 to Jan 2027
250 m away - Major
Devonshire Avenue, SouthseaHighway repair and maintenance works · PORTSMOUTH CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Major
Eastfield Road, SouthseaHighway repair and maintenance works · PORTSMOUTH CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major, planned
Cousins Grove, SouthseaUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
550 m away - Major
Cousins Grove, SouthseaUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
550 m away - Major, planned
Worsley Street, SouthseaUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
550 m away - Major
Worsley Street, SouthseaUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
550 m away - Major
Major infrastructure projects within 30 km
- Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
10.8 km away - Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
14.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: MMD Shipping Services (rooftop solar, 3.0 km); Portsmouth ERF (energy from waste, 3.9 km); Paulsgrove Landfill Site (landfill gas, 5.7 km); East Fairlee (solar farm, 10.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.