Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
1,034hours of spills in 2025 between them (typical neighbourhood: about 36)
74spill events counted
Southern Water
Chichester Wwtwinto Chichester Harbour62 spills, 985 hours in 2025
1.2 km away
Southern Water
Main Road Fishbourne Csointo Trib Of Chichester Harbour8 spills, 46 hours in 2025
350 m away
Southern Water
Chichester Wwtwinto Chichester Harbour4 spills, 4 hours in 2025
Clay Lane, ChichesterOptional permit (no fee) e.g. for traffic management etc · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 500 m away
Major, planned
Appledram Lane South, FishbourneUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Nov 2026 800 m away
Major
Appledram Lane South, FishbourneUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Nov 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
Rampion 2 Offshore Wind FarmGenerating Stations · Adjacent to the exisiting Rampion Wind Farm, approximately 13km off the Sussex Coast
decided Apr 2025 18.1 km away
Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation.
application due Q4 2019 18.3 km away
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 24.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Stockbridge & Fishbourne: +28% over five years (2020 → 2025).
Council tax list: 260 homes added in the neighbourhood since April 2024.
Population (GP registrations): +3.6% in two years.