Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
94hours of spills in 2025 between them (typical neighbourhood: about 36)
44spill events counted
Southern Water
The Gillies Fareham Csointo Blackbrook Stream11 spills, 33 hours in 2025
1.7 km away
Southern Water
High Street Fareham Csointo Wallington River12 spills, 30 hours in 2025
1.8 km away
Southern Water
Arundel Drive Fareham Csointo Trib Of Portsmouth Harbour14 spills, 19 hours in 2025
1.0 km away
Southern Water
Redlands Lane Fareham Csointo Black Brook5 spills, 13 hours in 2025
2.0 km away
Southern Water
Wickham Road Fareham Csointo River Wallington2 spills, 1 hours in 2025
1.8 km away
Southern Water
Wallington Hill Csointo River Wallington0 spills, 0 hours in 2025
41 planned, approved or being built and 8 running (133 MW between them). Those within 5 km are on the map above.
Rooftop solar
Fareham leisure centre, Park Lane - Solar PanelsApproved, not yet built · 250 kW
Nov 2024 1.0 km away
Rooftop solar
Tesco Quay StreetApproved, not yet built · 300 kW
Feb 2020 1.9 km away
Rooftop solar
Pet Centre Garsons Garden Centre, Fontley Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2022 2.4 km away
Battery storage
Titchfield LaneBeing built · 49 MW
Aug 2023 2.5 km away
Solar farm
Funtley Solar Photovoltaic PV FarmPlanning application in · 11 MW
Sept 2024 2.5 km away
Solar farm
Hoads Hill Reservoir - Solar PanelsApproved, not yet built · 160 kW
Sept 2021 2.7 km away
Battery storage
Ash Farm, Titchfield Lane - Battery StorageApproved, not yet built · 15 MW
Feb 2025 2.8 km away
Battery storage
Titchfield Lane, Wickham - Battery Energy Storage SystemApproved, not yet built
Mar 2026 2.8 km away
Battery storage
Bus Depot, Gosport Road - Battery Energy StorageApproved, not yet built
Aug 2024 3.1 km away
Rooftop solar
CooperVision, Concorde Way - Unit 8 - Solar PanelsApproved, not yet built · 900 kW
Jun 2025 3.5 km away
Rooftop solar
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
Major
Wickham Road, FarehamHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Feb 2027 850 m away
Major
Wickham Road, FarehamHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Sept 2026 to Feb 2027 900 m away
Standard
Kennedy Avenue, FarehamUtility repair and maintenance works · SOUTHERN WATER · Give and take
Oct 2026 to Oct 2026 700 m away
Standard
North Hill, FarehamDisconnection or alteration of supply · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · No carriageway incursion
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 3.1 km away
Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation.
application due Q4 2019 12.3 km away
Decided
M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
decided May 2024 24.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Fareham Common: +18% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.9% in two years.