What's changing near PO15 5AN
Within 2 km, around Fareham Common in Fareham. Building, planning, schools, transport, prices and crime.
38new homes completed within 2 km, last 2 years
146homes given permission on brownfield sites since 2021
-2.9%like-for-like prices in Fareham Common, 2024 → 2025 (council -0.6%)
-0%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
21homes extended 2021–2025, typically adding 34 m²
36since energy certificates began (2008)
1in PO15 5AN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
160hours of spills in 2025 between them (typical neighbourhood: about 36)
68spill events counted
- Southern Water
Elmhurst Road (Compass Point) Csointo Black Brook19 spills, 37 hours in 2025
1.5 km away - Southern Water
The Gillies Fareham Csointo Blackbrook Stream11 spills, 33 hours in 2025
950 m away - Southern Water
High Street Fareham Csointo Wallington River12 spills, 30 hours in 2025
1.8 km away - Southern Water
Quay Street, Fareham Csointo Fareham Creek/Portsmouth Hbr5 spills, 28 hours in 2025
1.6 km away - Southern Water
Arundel Drive Fareham Csointo Trib Of Portsmouth Harbour14 spills, 19 hours in 2025
450 m away - Southern Water
Redlands Lane Fareham Csointo Black Brook5 spills, 13 hours in 2025
1.1 km away - Southern Water
Wickham Road Fareham Csointo River Wallington2 spills, 1 hours in 2025
1.8 km away - Southern Water
Cotswold Walk Csointo Hoeford Stream0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
43 planned, approved or being built and 8 running (133 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Fareham leisure centre, Park Lane - Solar PanelsApproved, not yet built · 250 kW
Nov 2024
950 m away - Rooftop solar
Tesco Quay StreetApproved, not yet built · 300 kW
Feb 2020
1.5 km away - Battery storage
Bus Depot, Gosport Road - Battery Energy StorageApproved, not yet built
Aug 2024
2.4 km away - Rooftop solar
Pet Centre Garsons Garden Centre, Fontley Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2022
2.5 km away - Battery storage
Tanners Lane - Battery Energy Storage Facility (Phase One)Approved, not yet built · 40 MW
Nov 2019
2.8 km away - Solar farm
Funtley Solar Photovoltaic PV FarmPlanning application in · 11 MW
Sept 2024
3.2 km away - Battery storage
Titchfield LaneBeing built · 49 MW
Aug 2023
3.2 km away - Rooftop solar
CooperVision, Concorde Way - Unit 8 - Solar PanelsApproved, not yet built · 900 kW
Jun 2025
3.6 km away - Rooftop solar
Octagon House, Concorde Way - Solar PanelsApproved, not yet built · 410 kW
Dec 2023
3.6 km away - Battery storage
Ash Farm, Titchfield Lane - Battery StorageApproved, not yet built · 15 MW
Feb 2025
3.6 km away - Battery storage
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
Gudge Heath Lane, FarehamWorks for road purposes · HAMPSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
200 m away - Standard
Western Way, FarehamUtility asset works · Cornerstone Telecommunications Infrastructure Limited · Lane closure
Nov 2026 to Nov 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
3.5 km away - Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
13.0 km away - Decideddecided May 2024
24.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Newlands Farm Battery Storage Facility Phase 2 (battery storage, 2.6 km); Newlands Farm Solar (solar farm, 2.8 km); Raglington Farm (solar farm, 7.3 km); Paulsgrove Landfill Site (landfill gas, 7.7 km); Southwick Estate (solar farm, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.