What's changing near PO13 9EQ
Within 2 km, around Lee-on-the-Solent in Gosport. Building, planning, schools, transport, prices and crime.
1new homes completed within 2 km, last 2 years
394homes given permission on brownfield sites since 2021
+4.0%like-for-like prices in Lee-on-the-Solent, 2024 → 2025 (council +2.3%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionOct 2024
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
16homes extended 2021–2025, typically adding 27 m²
33since energy certificates began (2008)
3in PO13 9EQ itself
- Extendedcertificate 2026
- Extendedcertificate 2022
- Extendedcertificate 2020
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
4hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
- Southern Water
Queens Road Lee-On-The-Solent Ceointo The Solent · near bathing water: Hillhead; Lee-on-Solent; Stokes Bay3 spills, 3 hours in 2025
450 m away - Southern Water
Lakeside Lee-On-Solent Ceointo The Solent · near bathing water: Hillhead; Lee-on-Solent; Stokes Bay1 spills, 1 hours in 2025
350 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 4 running (64 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Range Superstore, Gunners Way - Solar panelsApproved, not yet built · 430 kW
Aug 2024
3.5 km away - Rooftop solar
Range Superstore, Gunners Way - Solar PanelsApproved, not yet built · 420 kW
Aug 2024
3.5 km away - Battery storage
Tanners Lane - Battery Energy Storage Facility (Phase One)Approved, not yet built · 40 MW
Nov 2019
4.0 km away - Solar farm
Qinetiq Haslar, Haslar Road - Solar PanelsApproved, not yet built · 730 kW
Jun 2023
4.6 km away - Rooftop solar
Walpole Road - Solar PanelsApproved, not yet built · 160 kW
Dec 2022
4.7 km away - Rooftop solar
Immigration Removal Centre, Dolphin Way - Solar panelsApproved, not yet built · 230 kW
Mar 2024
4.9 km away - Battery storage
Bus Depot, Gosport Road - Battery Energy StorageApproved, not yet built
Aug 2024
4.9 km away - Rooftop solar
Gunwharf Quays Shopping Centre - Solar PanelsApproved, not yet built · 640 kW
Jun 2023
6.1 km away - Rooftop solar
Tesco Quay StreetApproved, not yet built · 300 kW
Feb 2020
6.3 km away - Rooftop solar
Fareham leisure centre, Park Lane - Solar PanelsApproved, not yet built · 250 kW
Nov 2024
7.0 km away
Road and street works within 1 km
10 permitted works running now or planned, 5 of them major.
- Major
Portsmouth Road, Lee-On-The-SolentUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Sept 2027 to Oct 2027
200 m away - Major, planned
Fell Drive, Lee-On-The-SolentUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Two-way signals
Nov 2026 to Dec 2026
850 m away - Major, planned
Rosemary Walk, Lee-On-The-SolentUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · No carriageway incursion
Nov 2026 to Nov 2026
900 m away - Major, planned
Smeeton Road, Lee-On-The-SolentUtility repair and maintenance works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Give and take
Nov 2026 to Nov 2026
950 m away - Major, planned
Dominie Walk, Lee-On-The-SolentUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · No carriageway incursion
Nov 2026 to Nov 2026
950 m away - Standard
Spencer Drive, Lee-On-The-SolentUtility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Standard
Spencer Drive, Lee-On-The-SolentUtility repair and maintenance works · BT · Multi-way signals
Oct 2026 to Oct 2026
450 m away - Standard
Spencer Drive, Lee-On-The-SolentUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Standard
Rosemary Walk, Lee-On-The-SolentNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Major infrastructure projects within 30 km
- Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
8.6 km away - Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
17.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Newlands Farm Solar (solar farm, 3.9 km); Newlands Farm Battery Storage Facility Phase 2 (battery storage, 4.1 km); MMD Shipping Services (rooftop solar, 7.4 km); Paulsgrove Landfill Site (landfill gas, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.