What's changing near PO10 8EX
Within 2 km, around Southbourne, Bosham & Thorney in Chichester. Building, planning, schools, transport, prices and crime.
178new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.1%like-for-like prices in Southbourne, Bosham & Thorney, 2024 → 2025 (council -0.0%)
+24%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
20 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
1.6 km away - New homes
24 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
24 new homes completedhouses · Jul 2025 – Sep 2026
Sept 2026
1.7 km away - New homes
8 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
100 m away - New homes
9 new homes completedhouses · Sep 2025 – Feb 2026
Feb 2026
1.6 km away - New homes
7 new homes completedhouses · Apr 2025 – Jul 2025
Jul 2025
1.5 km away - New homes
14 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025
1.5 km away - New homes
8 new homes completedhouses · May 2025
May 2025
1.6 km away - New homes
5 new homes completedhouses · Mar 2025 – May 2025
May 2025
1.5 km away - New homes
10 new homes completedhouses · Jan 2025 – Mar 2025
Mar 2025
1.5 km away - New homes
8 new homes completedhouses · Nov 2024
Nov 2024
1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 31 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 44 m²
8since energy certificates began (2008)
1in PO10 8EX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
395hours of spills in 2025 between them (typical neighbourhood: about 36)
41spill events counted
- Southern Water
Thornham Wwtwinto Chichester Hbr Via Little Deep21 spills, 237 hours in 2025
1.0 km away - Southern Water
Thornham Wwtwinto Chichester Hbr Via Little Deep12 spills, 119 hours in 2025
1.0 km away - Southern Water
School Lane Psinto Ham Brook2 spills, 23 hours in 2025
1.8 km away - Southern Water
Kings Road Emsworth Csointo Nore Rithe/Emsworth Harbour2 spills, 10 hours in 2025
1.7 km away - Southern Water
Thornham Wwtwinto Chichester Hbr Via Little Deep4 spills, 6 hours in 2025
1.0 km away - Southern Water
Lumley Road Pumping Stationinto River Ems0 spills, 0 hours in 2025
850 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
18 planned, approved or being built and 4 running (29 MW between them). Those within 5 km are on the map above.
- Solar farm
Baker Barracks Solar DevelopmentApproved, not yet built · 2 MW
Feb 2021
2.8 km away - Rooftop solar
Spire Portsmouth Hospital, Bartons Road - Solar Pv PanelsApproved, not yet built · 150 kW
Apr 2024
3.4 km away - Battery storage
Bedhampton Pumping Station, Meyrick Road - Battery Energy StoragePlanning application in · 150 MW
May 2025
3.9 km away - Solar farm
Palk Road, Bedhampton - Solar PanelsApproved, not yet built · 250 kW
Jan 2022
5.3 km away - Rooftop solar
Walton Barn - Solar PanelsApproved, not yet built · 180 kW
Apr 2024
5.7 km away - Rooftop solar
Ham Farm, Bosham - Solar PanelsApproved, not yet built · 370 kW
Apr 2024
6.3 km away - Rooftop solar
Dunsbury Park, Fitzwygram Way - Solar PanelsApproved, not yet built · 1 MW
Jun 2024
6.8 km away - Solar farm
Farlington Water Treatment Works, Gillman Road - Solar PanelsApproved, not yet built · 4 MW
Nov 2022
7.4 km away - Rooftop solar
Harwin Engineers - Solar PanelsApproved, not yet built · 890 kW
May 2026
8.1 km away - Rooftop solar
Sainsburys, Fitzherbert Road - Solar PanelsApproved, not yet built · 540 kW
Feb 2025
8.2 km away - Rooftop solar
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Prinsted Lane, SouthbourneHighway improvement works · WEST SUSSEX COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
800 m away - Major
Prinsted Lane, SouthbourneHighway improvement works · WEST SUSSEX COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
11.4 km away - Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
16.2 km away - Decideddecided Apr 2025
25.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Southleigh Landfill (landfill gas, 3.2 km); Broadley Copse (anaerobic digestion, 6.0 km); Hunters Race Solar Park (solar farm, 9.3 km); Portsmouth ERF (energy from waste, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.