Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
924hours of spills in 2025 between them (typical neighbourhood: about 36)
62spill events counted
South West Water
Bridgend Pumping Stationinto Newton Creek (Estuarine)53 spills, 921 hours in 2025
750 m away
South West Water
Courtwood Road Pscso/Eointo River Yealm Estuary (E)4 spills, 2 hours in 2025
900 m away
South West Water
Kiln Quay Pumping Stationinto Newton Creek (Estuarine)2 spills, 1 hours in 2025
300 m away
South West Water
River Side No 1 Csointo Newton Creek (Estuarine)3 spills, 0 hours in 2025
100 m away
South West Water
Noss Mayo Pumping Stationinto Newton Creek (Estuarine)0 spills, 0 hours in 2025
25 planned, approved or being built and 7 running (31 MW between them). Those within 5 km are on the map above.
Battery storage
Butts Park, Newton Ferrers - Energy Storage FacilityApproved, not yet built · 200 kW
Apr 2025 1.3 km away
Battery storage
Deep Lane - Battery energy storageApproved, not yet built
Aug 2022 6.9 km away
Rooftop solar
Morrisons supermarket - Roof mounted Solar PhotovoltaicsApproved, not yet built · 670 kW
May 2022 7.1 km away
Rooftop solar
Sugar Mill Industrial Estate, Billacombe Road - Solar PanelsApproved, not yet built · 260 kW
Oct 2024 7.5 km away
Solar farm
Interfish, Wallsend Industrial Estate - Solar PanelsPlanning application in · 180 kW
Jun 2026 7.8 km away
Battery storage
Plymouth Stor Generation - Battery storageApproved, not yet built · 20 MW
Mar 2025 7.9 km away
Solar farm
Chelson Meadow - Solar FarmApproved, not yet built · 13 MW
Jun 2022 8.3 km away
Battery storage
Eastern Wood Road, Plympton - BatteriesApproved, not yet built · 200 kW
Mar 2025 8.3 km away
Rooftop solar
Western Wood Way, Plympton - Solar PanelsApproved, not yet built · 200 kW
Jul 2022 8.6 km away
Rooftop solar
Western Wood Way, Langage Business Park - Solar PanelsApproved, not yet built · 130 kW
Nov 2024 8.8 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Wembury, Brixton & Newton Ferrers: +27% over five years (2020 → 2025).
Council tax list: 550 homes added in the neighbourhood since April 2024.
Population (GP registrations): +17.6% in two years.