What's changing near PL19 0EB
Within 2 km, around Tavistock in West Devon. Building, planning, schools, transport, prices and crime.
87new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.5%like-for-like prices in Tavistock, 2024 → 2025 (council +0.1%)
+4%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
28 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
1.8 km away - New homes
7 new homes completedhouses · Mar 2025 – Oct 2026
Oct 2026
1.8 km away - New homes
6 new homes completedhouses · Jan 2025 – Sep 2026
Sept 2026
1.8 km away - New homes
15 new homes completedhouses · Nov 2024 – May 2026
May 2026
1.8 km away - New homes
12 new homes completed2 flats, 10 houses · Nov 2024 – Nov 2025
Nov 2025
1.9 km away - New homes
5 new homes completedhouses · Aug 2025 – Oct 2025
Oct 2025
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 30 m²
23since energy certificates began (2008)
1in PL19 0EB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
1,278hours of spills in 2025 between them (typical neighbourhood: about 36)
324spill events counted
- South West Water
Tavistock College Playing Fieldinto River Tavy80 spills, 501 hours in 2025
1.2 km away - South West Water
Siphon Telephone Box Csointo River Tavy64 spills, 292 hours in 2025
1.3 km away - South West Water
West Bridge Csointo River Tavy79 spills, 272 hours in 2025
950 m away - South West Water
Bishop Mead Combined Sewer Overflowinto Tiddy Brook29 spills, 115 hours in 2025
1.8 km away - South West Water
Pixon Lane Combined Sewer Overflowinto River Tavy67 spills, 96 hours in 2025
650 m away - South West Water
Plymouth Road Csointo River Tavy Via Sws5 spills, 2 hours in 2025
700 m away - South West Water
Church Lane Csointo River Tavy Via Sws0 spills, 0 hours in 2025
700 m away - South West Water
Mount House School Psinto Trib Of The River Tavy0 spills, 0 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
1 planned, approved or being built and 1 running (150 kW between them). Those within 5 km are on the map above.
Running nearest: Parkwood Road Rooftop Solar Array (rooftop solar, 1.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
7 permitted works running now or planned, 3 of them major.
- Major, planned
The Dell, TavistockUtility asset works · BT · Road closure
Nov 2026 to Dec 2026
450 m away - Major, planned
Brook Street, TavistockUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Nov 2026 to Nov 2026
500 m away - Major
Brook Street, TavistockUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Nov 2026 to Nov 2026
500 m away - Standard
Rocky Hill, TavistockUtility repair and maintenance works · SOUTH WEST WATER · Some carriageway incursion
Oct 2026 to Nov 2026
250 m away - Standard
Ordulf Road, TavistockHighway repair and maintenance works · DEVON COUNTY COUNCIL · Give and take
Oct 2026 to Nov 2026
400 m away - Standard
Peryn Road, TavistockHighway repair and maintenance works · DEVON COUNTY COUNCIL · Give and take
Oct 2026 to Nov 2026
550 m away - Standard
Tamar Avenue, TavistockNew service connection · National Grid Electricity Distribution (South West) · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.