Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
16storm overflows within 2 km
854hours of spills in 2025 between them (typical neighbourhood: about 36)
238spill events counted
South West Water
Kinterbury Creek Pumping Stationinto River Tamar Viasws (Estuarine)20 spills, 247 hours in 2025
2.0 km away
South West Water
Riverview Pscso/Eointo Saltmill Creek(E)20 spills, 212 hours in 2025
950 m away
South West Water
Forder No 1 Pscso/Eointo River Lyner (S)28 spills, 201 hours in 2025
1.3 km away
South West Water
Adit Lane Csointo Tributary Of Saltmill Creek(S)60 spills, 90 hours in 2025
500 m away
South West Water
Cowdry Close Csointo River Tamar Estuary (E)17 spills, 37 hours in 2025
800 m away
South West Water
Coombe Road Csointo River Tamar Estuary(E)10 spills, 26 hours in 2025
1.3 km away
South West Water
Waterside Pumping Stationinto River Tamar Estuary(E)8 spills, 10 hours in 2025
1.5 km away
South West Water
Forder No 2 Pscso/Eointo River Lyner (E)5 spills, 8 hours in 2025
28 planned, approved or being built and 15 running (85 MW between them). Those within 5 km are on the map above.
Solar farm
China Fleet Country Club - Solar ArrayApproved, not yet built · 600 kW
Dec 2024 500 m away
Solar farm
China Fleet Country Club, Pill Lane - Solar ArrayPlanning application in · 600 kW
Oct 2024 900 m away
Rooftop solar
Spinnaker International Spinnaker House, Long Acre - Solar PanelsApproved, not yet built · 160 kW
Dec 2023 1.0 km away
Battery storage
Battery Box - Birch House - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jan 2024 1.1 km away
Rooftop solar
Kawasaki Factory, Ernesettle Lane - Solar PanelsApproved, not yet built
Jun 2023 2.6 km away
Battery storage
West Kingsmill, Landulph - Battery StorageApproved, not yet built · 80 MW
Jul 2025 3.3 km away
Battery storage
Landulph Substation, Ellbridge Lane - Battery Energy StorageApproved, not yet built · 50 MW
Sept 2023 4.0 km away
Battery storage
Trevol Business ParkApproved, not yet built · 10 MW
Sept 2019 4.1 km away
Battery storage
Landulph, Ellbridge Lane - Battery Storage FacilityApproved, not yet built · 50 MW
Feb 2023 4.2 km away
Rooftop solar
Princess Yachts Limited - Solar PV systemBeing built · 700 kW
Jan 2022 6.6 km away
Road and street works within 1 km
9 permitted works running now or planned, 5 of them major.
Major
The Square, Lower BurratonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Jan 2027 to Feb 2027 900 m away
Major, planned
Yellowtor Road, SaltashUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Sept 2026 to Mar 2027 900 m away
Major
Yellowtor Road, SaltashUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Sept 2026 to Mar 2027 900 m away
Major
Langerwell Close, Lower BurratonUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Sept 2026 to Nov 2026 1000 m away
Major
Langerwell Close, Lower BurratonUtility asset works · National Grid Electricity Distribution (South West) · Give and take
Nov 2026 to Nov 2026 1000 m away
Standard
North Road, SaltashUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Multi-way signals
Nov 2026 to Nov 2026 900 m away
Minor
Gilston Road, SaltashHighway repair and maintenance works · CORNWALL COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 800 m away
Minor
Gilston Road, SaltashHighway repair and maintenance works · CORNWALL COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026 800 m away
Minor
Callington Road, SaltashHighway repair and maintenance works · CORNWALL COUNCIL · Multi-way signals
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Saltash Town & Pillmere: +27% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.