What's changing near PE9 3EL
Within 2 km, around Barnack, Wittering & Wansford in Peterborough. Building, planning, schools, transport, prices and crime.
0new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-6.5%like-for-like prices in Barnack, Wittering & Wansford, 2024 → 2025 (council +1.0%)
+16%recorded crime, last 12 months vs the 12 before
On the map
Extended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
3homes extended 2021–2025, typically adding 84 m²
6since energy certificates began (2008)
0in PE9 3EL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
13 planned, approved or being built and 0 running. Those within 5 km are on the map above.
- Solar farm
Wittering Ford Road, Barnack - Solar Photovoltaic FarmApproved, not yet built · 11 MW
Nov 2023
2.0 km away - Battery storage
Wittering Ford RoadApproved, not yet built · 3 MW
Nov 2019
2.3 km away - Rooftop solar
Morrison - Roof mounted solar panelsApproved, not yet built · 680 kW
Jun 2022
5.0 km away - Rooftop solar
Cherryholt Road - Solar PanelsApproved, not yet built · 170 kW
Aug 2022
5.0 km away - Solar farm
Mallard Pass Solar FarmApproved, not yet built · 350 MW
Jul 2024
7.5 km away - Rooftop solar
Coningsby Business Park, Stirling Way - Solar PanelsApproved, not yet built · 1 MW
Apr 2024
8.7 km away - Rooftop solar
Stirling Way, Bretton - Solar PanelsApproved, not yet built · 250 kW
Nov 2024
8.7 km away - Rooftop solar
Coningsby Business Park, Stirling Way - Solar PanelsApproved, not yet built · 300 kW
Jul 2025
8.7 km away - Battery storage
Dukesmead Road, Dukesmead Industrial Estate - Battery Storage SystemApproved, not yet built · 200 kW
Sept 2025
8.7 km away - Battery storage
Lincoln Road - Energy Storage SystemApproved, not yet built · 200 kW
Oct 2025
9.1 km away - Battery storage
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A47 Wansford to SuttonHighways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023
5.2 km away - Decided
Mallard Pass Solar ProjectGenerating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024
7.5 km away - Decideddecided Jul 2013
8.4 km away - Decideddecided Jan 2023
8.8 km away - Examination
Meridian Solar FarmGenerating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026
24.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.