Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
New-home postcodes with fewer than 5 homes are counted above but not listed. 59 postcodes nearby had new homes completed in the last two years.
Battery storage
Vicarage Farm - Energy Storage SystemApproved, not yet built · 200 kW
Oct 2025 5.7 km away
Rooftop solar
Peterborough Regional College, Park Crescent - Solar PanelsApproved, not yet built · 590 kW
Dec 2025 5.8 km away
Running nearest: Peterborough EfW (energy from waste, 5.7 km); McCain Foods AD Plant (AD) (anaerobic digestion, 6.5 km); Whittlesey (wind farm, 6.7 km); Dogsthorpe South Landfill Site (landfill gas, 7.5 km); Dogsthorpe South Landfill Site 2 (landfill gas, 7.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Chatteris Wind FarmGenerating Stations · Located south of Chatteris, in East Anglia
application due July 2027 26.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.