What's changing near PE7 8DU
Within 2 km, around Hargate & Orton Longueville in Peterborough. Building, planning, schools, transport, prices and crime.
446new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.6%like-for-like prices in Hargate & Orton Longueville, 2024 → 2025 (council +1.0%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
16 new homes completedhouses · May 2025 – Oct 2026
Oct 2026
1.9 km away - New homes
6 new homes completedhouses · May 2025 – Sep 2026
Sept 2026
2.0 km away - New homes
19 new homes completedhouses · Nov 2024 – Jun 2026
Jun 2026
2.0 km away - New homes
13 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.9 km away - New homes
5 new homes completedhouses · May 2026
Jun 2026
1.6 km away - New homes
22 new homes completedhouses · Aug 2025 – Jun 2026
Jun 2026
1.7 km away - New homes
93 new homes completedhouses · Jan 2025 – May 2026
May 2026
1.9 km away - New homes
7 new homes completedhouses · Nov 2024 – Apr 2026
Apr 2026
2.0 km away - New homes
16 new homes completedhouses · Nov 2024 – Mar 2026
Mar 2026
1.9 km away - New homes
80 new homes completedflats · Feb 2026
Feb 2026
700 m away - New homes
11 new homes completedhouses · Oct 2024 – Oct 2025
Oct 2025
1.9 km away - New homes
26 new homes completedhouses · Feb 2025 – Aug 2025
Aug 2025
1.7 km away
7homes extended 2021–2025, typically adding 27 m²
27since energy certificates began (2008)
3in PE7 8DU itself
- Extendedcertificate 2016
- Extendedcertificate 2015
- Extendedcertificate 2011
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
29 planned, approved or being built and 6 running (23 MW between them). Those within 5 km are on the map above.
- Rooftop solar
J S Davidson Limited, Shrewsbury Avenue - Solar PV panelsApproved, not yet built · 1 MW
Sept 2024
1.3 km away - Rooftop solar
Kiddicare, Club Way - Solar PanlesApproved, not yet built · 960 kW
May 2024
1.4 km away - Rooftop solar
Nene Park Academy, Orton Longueville - Photovoltaic PanelsApproved, not yet built · 280 kW
Oct 2022
1.4 km away - Rooftop solar
Strada Alwalton Hill - Solar PanelsApproved, not yet built · 690 kW
Jul 2022
2.2 km away - Rooftop solar
Veolia Water Technologies, Newcombe Way - Solar PanelsApproved, not yet built · 340 kW
Nov 2025
2.5 km away - Rooftop solar
Imperial Way, Eagle Business Park - Solar PV SystemApproved, not yet built · 350 kW
Nov 2024
3.1 km away - Rooftop solar
David Lloyd Clubs, Thorpe Wood - Solar PanelsApproved, not yet built
Aug 2023
3.4 km away - Battery storage
Rightwell West, Bretton - Micro Energy StorageApproved, not yet built · 200 kW
Nov 2025
5.2 km away - Battery storage
Third Drove, Fengate - Battery StorageApproved, not yet built · 50 MW
Jan 2023
5.6 km away - Battery storage
Inclusive, Titan Drive - Micro Energy storage facilityApproved, not yet built · 200 kW
Sept 2024
5.7 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
Eagle Way, PeterboroughUtility asset works · INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026
950 m away - Minor
Leighton, PeterboroughUtility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026
750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A47 Wansford to SuttonHighways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023
9.2 km away - Decideddecided Jul 2013
17.0 km away - Decideddecided Jan 2023
17.3 km away - Decided
Mallard Pass Solar ProjectGenerating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024
20.4 km away - Examination
Meridian Solar FarmGenerating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026
22.9 km away - Pre-application
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028
25.1 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Peterborough EfW (energy from waste, 5.9 km); McCain Foods AD Plant (AD) (anaerobic digestion, 7.0 km); Whittlesey (wind farm, 7.2 km); Dogsthorpe South Landfill Site (landfill gas, 7.5 km); Dogsthorpe South Landfill Site 2 (landfill gas, 7.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.