Country England and Wales › Region East of England › Council Huntingdonshire › Neighbourhood Yaxley & Farcet › Postcode PE7 3YY What's changing near PE7 3YY Within 2 km, around Yaxley & Farcet in Huntingdonshire. Building, planning, schools, transport, prices and crime.
739 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.7% like-for-like prices in Yaxley & Farcet, 2024 → 2025 (council +2.6%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 45 new homes completed houses · Feb 2025 – Oct 2026
planned Oct 2026 1.5 km away New homes 6 new homes completed houses · Mar 2025 – Oct 2026
planned Oct 2026 1.2 km away New homes 11 new homes completed houses · Nov 2024 – Oct 2026
planned Oct 2026 1.3 km away New homes 65 new homes completed houses · Nov 2024 – Oct 2026
planned Oct 2026 1.3 km away New homes 46 new homes completed 3 flats, 43 houses · Apr 2025 – Oct 2026
planned Oct 2026 1.3 km away New homes 8 new homes completed houses · Mar 2026 – Oct 2026
planned Oct 2026 2.0 km away New homes 26 new homes completed houses · Nov 2024 – Sep 2026
Sept 2026 1.1 km away New homes 17 new homes completed houses · Feb 2025 – Sep 2026
Sept 2026 1.6 km away New homes 21 new homes completed houses · Jan 2025 – Jul 2026
Jul 2026 1.2 km away New homes 21 new homes completed houses · Nov 2024 – Jul 2026
Jul 2026 1.1 km away New homes 5 new homes completed houses · May 2026
Jun 2026 1.9 km away New homes 22 new homes completed houses · Aug 2025 – Jun 2026
Jun 2026 1.9 km away 19 homes extended 2021–2025, typically adding 42 m²
41 since energy certificates began (2008)
0 in PE7 3YY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 4 running (20 MW between them). Those within 5 km are on the map above.
Rooftop solar Imperial Way, Eagle Business Park - Solar PV System Approved, not yet built · 350 kW
Nov 2024 2.2 km away Rooftop solar Strada Alwalton Hill - Solar Panels Approved, not yet built · 690 kW
Jul 2022 3.2 km away Rooftop solar Kiddicare, Club Way - Solar Panles Approved, not yet built · 960 kW
May 2024 3.7 km away Rooftop solar J S Davidson Limited, Shrewsbury Avenue - Solar PV panels Approved, not yet built · 1 MW
Sept 2024 4.3 km away Rooftop solar Veolia Water Technologies, Newcombe Way - Solar Panels Approved, not yet built · 340 kW
Nov 2025 4.6 km away Rooftop solar Nene Park Academy, Orton Longueville - Photovoltaic Panels Approved, not yet built · 280 kW
Oct 2022 4.7 km away Rooftop solar David Lloyd Clubs, Thorpe Wood - Solar Panels Approved, not yet built
Aug 2023 6.6 km away Battery storage Third Drove, Fengate - Battery Storage Approved, not yet built · 50 MW
Jan 2023 7.5 km away Battery storage Inclusive, Titan Drive - Micro Energy storage facility Approved, not yet built · 200 kW
Sept 2024 7.7 km away Anaerobic digestion The Drove, Pondersbridge - Anaerobic Digestion Plant Approved, not yet built · 7 MW
Sept 2023 8.0 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided A47 Wansford to Sutton Highways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023 11.7 km away Decided decided Jul 2013 18.8 km away Decided decided Jan 2023 19.1 km away Decided Mallard Pass Solar Project Generating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024 23.4 km away Pre-application Fens Reservoir Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028 23.7 km away Pre-application application due July 2027 24.9 km away Examination
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: McCain Foods AD Plant (AD) (anaerobic digestion, 8.0 km); Peterborough EfW (energy from waste, 8.0 km); Whittlesey (wind farm, 8.0 km); Black Bush Farm (solar farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.