Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
15 new homes completedhouses · Nov 2025 – Mar 2026
Mar 2026 1.2 km away
New homes
21 new homes completed1 flats, 20 houses · Sep 2025 – Feb 2026
Feb 2026 1.2 km away
New homes
23 new homes completedhouses · Mar 2025 – Jan 2026
Jan 2026 1.7 km away
New homes
10 new homes completedhouses · Aug 2025 – Jan 2026
Jan 2026 1.2 km away
New homes
21 new homes completed1 flats, 20 houses · Mar 2025 – Nov 2025
Nov 2025 1.2 km away
New homes
13 new homes completed6 flats, 7 houses · Dec 2024 – Oct 2025
Oct 2025 1.2 km away
New homes
24 new homes completed17 flats, 7 houses · May 2025 – Aug 2025
Aug 2025 1.4 km away
New homes
25 new homes completed16 flats, 9 houses · Apr 2025 – Jul 2025
Jul 2025 1.3 km away
New homes
5 new homes completedhouses · Jun 2025
Jun 2025 1.7 km away
New homes
8 new homes completedhouses · Nov 2024 – May 2025
May 2025 1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 32 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Collmart Growers Limited - Solar PanelsApproved, not yet built
Jul 2023 6.6 km away
Rooftop solar
David Lloyd Clubs, Thorpe Wood - Solar PanelsApproved, not yet built
Aug 2023 6.7 km away
Running nearest: McCain Foods AD Plant (AD) (anaerobic digestion, 6.4 km); Whittlesey (wind farm, 6.4 km); Peterborough EfW (energy from waste, 6.7 km); Black Bush Farm (solar farm, 7.3 km); Glass Moor (wind farm, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Chatteris Wind FarmGenerating Stations · Located south of Chatteris, in East Anglia
application due July 2027 24.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.