Country England and Wales › Region East of England › Council Peterborough › Neighbourhood Hargate & Orton Longueville › Postcode PE7 0LU What's changing near PE7 0LU Within 2 km, around Hargate & Orton Longueville in Peterborough. Building, planning, schools, transport, prices and crime.
579 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.6% like-for-like prices in Hargate & Orton Longueville, 2024 → 2025 (council +1.0%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 8 new homes completed houses · May 2025 – Oct 2026
planned Oct 2026 1.8 km away New homes 21 new homes completed houses · Nov 2024 – Oct 2026
planned Oct 2026 1.7 km away New homes 17 new homes completed houses · May 2025 – Oct 2026
planned Oct 2026 850 m away New homes 9 new homes completed houses · Nov 2024 – Jul 2026
Jul 2026 1.1 km away New homes 13 new homes completed houses · Dec 2025 – Jun 2026
Jun 2026 700 m away New homes 93 new homes completed houses · Jan 2025 – May 2026
May 2026 750 m away New homes 7 new homes completed houses · Nov 2024 – Apr 2026
Apr 2026 950 m away New homes 22 new homes completed 9 flats, 13 houses · Jun 2025 – Mar 2026
Mar 2026 1.8 km away New homes 19 new homes completed 10 flats, 9 houses · Oct 2025 – Mar 2026
Mar 2026 1.8 km away New homes 16 new homes completed houses · Nov 2024 – Mar 2026
Mar 2026 1000 m away New homes 80 new homes completed flats · Feb 2026
Feb 2026 1.7 km away New homes 23 new homes completed houses · Mar 2025 – Jan 2026
Jan 2026 1.7 km away 2 homes extended 2021–2025, typically adding 47 m²
2 since energy certificates began (2008)
0 in PE7 0LU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
0 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 29 planned, approved or being built and 6 running (23 MW between them). Those within 5 km are on the map above.
Rooftop solar Kiddicare, Club Way - Solar Panles Approved, not yet built · 960 kW
May 2024 600 m away Rooftop solar J S Davidson Limited, Shrewsbury Avenue - Solar PV panels Approved, not yet built · 1 MW
Sept 2024 1.0 km away Rooftop solar Nene Park Academy, Orton Longueville - Photovoltaic Panels Approved, not yet built · 280 kW
Oct 2022 2.5 km away Rooftop solar Imperial Way, Eagle Business Park - Solar PV System Approved, not yet built · 350 kW
Nov 2024 2.8 km away Battery storage Third Drove, Fengate - Battery Storage Approved, not yet built · 50 MW
Jan 2023 3.7 km away Battery storage Inclusive, Titan Drive - Micro Energy storage facility Approved, not yet built · 200 kW
Sept 2024 3.8 km away Rooftop solar David Lloyd Clubs, Thorpe Wood - Solar Panels Approved, not yet built
Aug 2023 4.0 km away Battery storage Vicarage Farm - Energy Storage System Approved, not yet built · 200 kW
Oct 2025 4.1 km away Rooftop solar Strada Alwalton Hill - Solar Panels Approved, not yet built · 690 kW
Jul 2022 4.1 km away Rooftop solar Peterborough Regional College, Park Crescent - Solar Panels Approved, not yet built · 590 kW
Dec 2025 4.3 km away Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided A47 Wansford to Sutton Highways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023 10.5 km away Decided decided Jul 2013 18.5 km away Decided decided Jan 2023 18.8 km away Decided Mallard Pass Solar Project Generating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024 20.8 km away Examination Meridian Solar Farm Generating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026 21.1 km away Pre-application Fens Reservoir Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028 23.6 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Peterborough EfW (energy from waste, 4.0 km); McCain Foods AD Plant (AD) (anaerobic digestion, 5.0 km); Whittlesey (wind farm, 5.2 km); Dogsthorpe South Landfill Site (landfill gas, 6.1 km); Dogsthorpe South Landfill Site 2 (landfill gas, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.