Country England and Wales › Region East Midlands › Council South Kesteven › Neighbourhood Langtoft, Thurlby & Uffington › Postcode PE6 9RR What's changing near PE6 9RR Within 2 km, around Langtoft, Thurlby & Uffington in South Kesteven. Building, planning, schools, transport, prices and crime.
66 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.3% like-for-like prices in Langtoft, Thurlby & Uffington, 2024 → 2025 (council +1.3%)
+32% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended homeBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 18 new homes completed houses · Mar 2026 – Aug 2026
Aug 2026 1.9 km away New homes 26 new homes completed houses · Dec 2025 – Aug 2026
Aug 2026 1.9 km away New homes 14 new homes completed houses · Sep 2025 – Apr 2026
Apr 2026 1.8 km away New homes 5 new homes completed houses · Feb 2025 – Oct 2025
Oct 2025 900 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 21 m²
13 since energy certificates began (2008)
2 in PE6 9RR itself
Extended certificate 2020 Extended certificate 2019 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 7 planned, approved or being built and 2 running (21 MW between them). Those within 5 km are on the map above.
Solar farm Northorpe Fen Farm, Fen Road - Solar Farm Approved, not yet built · 15 MW
Dec 2025 5.8 km away Rooftop solar Kellington House, South Fen Road - Solar Panels Approved, not yet built · 150 kW
Mar 2023 6.8 km away Solar farm Mallard Pass Solar Farm Approved, not yet built · 350 MW
Jul 2024 7.5 km away Solar farm Home Farm - Solar PV Farm Approved, not yet built · 28 MW
Mar 2025 8.2 km away Solar farm Limes Farm Solar Farm & Battery Energy Storage Approved, not yet built · 20 MW
May 2025 8.9 km away Battery storage Limes Farm Solar Farm & Battery Energy Storage Approved, not yet built
May 2025 8.9 km away Rooftop solar Morrison - Roof mounted solar panels Approved, not yet built · 680 kW
Jun 2022 9.7 km away Running nearest: Deeping St Nicholas Wind Farm (wind farm, 8.6 km); Limes Farm Solar Farm (solar farm, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Mallard Pass Solar Project Generating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024 7.5 km away Decided A47 Wansford to Sutton Highways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023 13.2 km away Decided decided Jul 2013 16.9 km away Decided decided Jan 2023 17.2 km away Examination Meridian Solar Farm Generating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026 18.4 km away Decided decided Sept 2016 27.3 km away Pre-application
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.