What's changing near PE6 9QQ
Within 2 km, around Langtoft, Thurlby & Uffington in South Kesteven. Building, planning, schools, transport, prices and crime.
7new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.3%like-for-like prices in Langtoft, Thurlby & Uffington, 2024 → 2025 (council +1.3%)
+32%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 22 m²
13since energy certificates began (2008)
1in PE6 9QQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
8 planned, approved or being built and 2 running (21 MW between them). Those within 5 km are on the map above.
- Solar farm
Northorpe Fen Farm, Fen Road - Solar FarmApproved, not yet built · 15 MW
Dec 2025
5.8 km away - Solar farm
Mallard Pass Solar FarmApproved, not yet built · 350 MW
Jul 2024
6.8 km away - Rooftop solar
Kellington House, South Fen Road - Solar PanelsApproved, not yet built · 150 kW
Mar 2023
7.1 km away - Solar farm
Home Farm - Solar PV FarmApproved, not yet built · 28 MW
Mar 2025
7.7 km away - Rooftop solar
Morrison - Roof mounted solar panelsApproved, not yet built · 680 kW
Jun 2022
9.0 km away - Solar farm
Limes Farm Solar Farm & Battery Energy StorageApproved, not yet built · 20 MW
May 2025
9.3 km away - Battery storage
Limes Farm Solar Farm & Battery Energy StorageApproved, not yet built
May 2025
9.3 km away - Rooftop solar
Cherryholt Road - Solar PanelsApproved, not yet built · 170 kW
Aug 2022
9.6 km away
Running nearest: Limes Farm Solar Farm (solar farm, 8.9 km); Deeping St Nicholas Wind Farm (wind farm, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Stowe Road, LangtoftUtility asset works · ANGLIAN WATER · No carriageway incursion
Sept 2026 to Nov 2026
600 m away - Major
Stowe Road, LangtoftUtility asset works · ANGLIAN WATER · No carriageway incursion
Sept 2026 to Nov 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Mallard Pass Solar ProjectGenerating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024
6.8 km away - Decided
A47 Wansford to SuttonHighways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023
13.0 km away - Decideddecided Jul 2013
16.3 km away - Decideddecided Jan 2023
16.6 km away - Examination
Meridian Solar FarmGenerating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026
19.0 km away - Pre-application
Lincolnshire ReservoirDams and Reservoirs · 7km southwest of Sleaford, between the settlements of Swaton, Scredington and Helpringham application due November 2028
27.5 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.