What's changing near PE6 9EL
Within 2 km, around Glinton, Northborough & Maxey in Peterborough. Building, planning, schools, transport, prices and crime.
2new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+6.2%like-for-like prices in Glinton, Northborough & Maxey, 2024 → 2025 (council +1.0%)
+9%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 54 m²
10since energy certificates began (2008)
0in PE6 9EL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
16 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
- Battery storage
Dukesmead Road, Dukesmead Industrial Estate - Battery Storage SystemApproved, not yet built · 200 kW
Sept 2025
6.4 km away - Battery storage
Lincoln Road - Energy Storage SystemApproved, not yet built · 200 kW
Oct 2025
6.6 km away - Rooftop solar
Coningsby Business Park, Stirling Way - Solar PanelsApproved, not yet built · 1 MW
Apr 2024
6.7 km away - Rooftop solar
Stirling Way, Bretton - Solar PanelsApproved, not yet built · 250 kW
Nov 2024
6.7 km away - Rooftop solar
Coningsby Business Park, Stirling Way - Solar PanelsApproved, not yet built · 300 kW
Jul 2025
6.7 km away - Rooftop solar
F P Smith Motors, Sturrock Way - Solar PV SystemApproved, not yet built · 200 kW
May 2023
8.0 km away - Rooftop solar
Baker Perkins, Manor Drive - Solar PanelsApproved, not yet built · 1 MW
Sept 2025
8.0 km away - Solar farm
Wittering Ford Road, Barnack - Solar Photovoltaic FarmApproved, not yet built · 11 MW
Nov 2023
8.1 km away - Battery storage
Wittering Ford RoadApproved, not yet built · 3 MW
Nov 2019
8.3 km away - Battery storage
Rightwell West, Bretton - Micro Energy StorageApproved, not yet built · 200 kW
Nov 2025
8.5 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
- Major, planned
Tuckers Nook, MaxeyUtility repair and maintenance works · ANGLIAN WATER · Road closure
Nov 2026 to Nov 2026
350 m away - Major
Maxey 12 Section 1 Footpath, MaxeyUtility asset works · ANGLIAN WATER · Road closure
Oct 2026 to Oct 2026
950 m away - Major
Maxey Road, MaxeyRemedial works · ANGLIAN WATER · Road closure
Dec 2026 to Dec 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Mallard Pass Solar ProjectGenerating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024
8.6 km away - Decided
A47 Wansford to SuttonHighways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023
9.5 km away - Decideddecided Jul 2013
14.5 km away - Decideddecided Jan 2023
14.9 km away - Examination
Meridian Solar FarmGenerating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026
18.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Dogsthorpe South Landfill Site (landfill gas, 9.9 km); Dogsthorpe South Landfill Site 2 (landfill gas, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.