Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
9hours of spills in 2025 between them (typical neighbourhood: about 36)
Johnsons Aggregates And Recycling, Peterborough Road - Solar PanelsApproved, not yet built · 200 kW
Mar 2023 6.0 km away
Battery storage
Kings Dyke, Whittlesey - Battery Energy StorageApproved, not yet built · 10 MW
May 2025 6.2 km away
Running nearest: Dogsthorpe South Landfill Site 2 (landfill gas, 2.7 km); Dogsthorpe South Landfill Site (landfill gas, 2.7 km); Peterborough EfW (energy from waste, 4.2 km); McCain Foods AD Plant (AD) (anaerobic digestion, 5.8 km); Whittlesey (wind farm, 5.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington
application due September 2028 23.2 km away
Pre-application
Chatteris Wind FarmGenerating Stations · Located south of Chatteris, in East Anglia
application due July 2027 28.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.