Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
461hours of spills in 2025 between them (typical neighbourhood: about 36)
29spill events counted
Anglian Water
Crowland Stwinto Green Bank Drn,New S. Eau Rive29 spills, 461 hours in 2025
Dogsthorpe, Welland Road - Solar Farm & Battery StorageApproved, not yet built
Jun 2024 10.0 km away
Running nearest: Decoy Farm (Farm AD) (anaerobic digestion, 3.3 km); Decoy Farm (solar farm, 3.6 km); French Farm (wind farm, 4.6 km); Deeping St Nicholas Wind Farm (wind farm, 7.4 km); Dogsthorpe South Landfill Site 2 (landfill gas, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington
application due September 2028 27.6 km away
Decided
Triton Knoll Electrical SystemElectric Lines · 33km off the Lincolnshire coast to the Triton Knoll Substation in Lincolnshire
decided Sept 2016 28.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.