What's changing near PE4 6JJ
Within 2 km, around Walton in Peterborough. Building, planning, schools, transport, prices and crime.
6new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.1%like-for-like prices in Walton, 2024 → 2025 (council +1.0%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 18 m²
26since energy certificates began (2008)
0in PE4 6JJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
1spill events counted
- Anglian Water
Peterborough-Werrton Lincoln Roadinto Werrington Brook1 spills, 0 hours in 2025
650 m away - Anglian Water
Peterborough - Ullswater Ave Csointo Werrington Brook0 spills, 0 hours in 2025
850 m away - Anglian Water
Bretton North Pumping Stationinto Unnamed Watercourse0 spills, 0 hours in 2025
1.1 km away - Anglian Water
Peterborough Werrton Fenbridge Tpsinto Werrington Brook0 spills, 0 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
26 planned, approved or being built and 5 running (21 MW between them). Those within 5 km are on the map above.
- Rooftop solar
F P Smith Motors, Sturrock Way - Solar PV SystemApproved, not yet built · 200 kW
May 2023
750 m away - Battery storage
Lincoln Road - Energy Storage SystemApproved, not yet built · 200 kW
Oct 2025
800 m away - Rooftop solar
Stirling Way, Bretton - Solar PanelsApproved, not yet built · 250 kW
Nov 2024
950 m away - Rooftop solar
Coningsby Business Park, Stirling Way - Solar PanelsApproved, not yet built · 300 kW
Jul 2025
950 m away - Rooftop solar
Coningsby Business Park, Stirling Way - Solar PanelsApproved, not yet built · 1 MW
Apr 2024
950 m away - Battery storage
Dukesmead Road, Dukesmead Industrial Estate - Battery Storage SystemApproved, not yet built · 200 kW
Sept 2025
1.0 km away - Rooftop solar
Baker Perkins, Manor Drive - Solar PanelsApproved, not yet built · 1 MW
Sept 2025
2.0 km away - Battery storage
Rightwell West, Bretton - Micro Energy StorageApproved, not yet built · 200 kW
Nov 2025
2.1 km away - Solar farm
Dogsthorpe, Welland Road - Solar Farm & Battery StorageApproved, not yet built · 14 MW
Jun 2024
2.2 km away - Battery storage
Dogsthorpe, Welland Road - Solar Farm & Battery StorageApproved, not yet built
Jun 2024
2.2 km away
Road and street works within 1 km
5 permitted works running now or planned, 1 of them major.
- Major
Lincoln Road, PeterboroughUtility repair and maintenance works · ANGLIAN WATER · No carriageway incursion
Sept 2026 to Oct 2026
950 m away - Minor
Montagu Road, PeterboroughUtility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · No carriageway incursion
Oct 2026 to Oct 2026
850 m away - Minor
Fulbridge Road, PeterboroughUtility repair and maintenance works · ANGLIAN WATER · Two-way signals
Oct 2026 to Oct 2026
900 m away - Minor
Fulbridge Road, PeterboroughUtility repair and maintenance works · ANGLIAN WATER · Two-way signals
Oct 2026 to Oct 2026
950 m away - Immediate - urgent
Lincoln Road, PeterboroughUtility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
May 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A47 Wansford to SuttonHighways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023
8.8 km away - Decided
Mallard Pass Solar ProjectGenerating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024
15.5 km away - Decideddecided Jul 2013
16.6 km away - Decideddecided Jan 2023
17.0 km away - Examination
Meridian Solar FarmGenerating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026
17.5 km away - Pre-application
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028
27.6 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Dogsthorpe South Landfill Site (landfill gas, 3.2 km); Dogsthorpe South Landfill Site 2 (landfill gas, 3.3 km); Peterborough EfW (energy from waste, 5.4 km); McCain Foods AD Plant (AD) (anaerobic digestion, 8.2 km); Whittlesey (wind farm, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.