What's changing near PE2 8PD
Within 2 km, around Stanground in Peterborough. Building, planning, schools, transport, prices and crime.
142new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.6%like-for-like prices in Stanground, 2024 → 2025 (council +1.0%)
-15%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
34 new homes completedflats · May 2026
May 2026
1.8 km away - New homes
66 new homes completedflats · May 2026
May 2026
1.8 km away - New homes
8 new homes completedhouses · Jan 2025
Jan 2025
250 m away - New homes
18 new homes completedflats · Jan 2025
Jan 2025
250 m away - New schoolSept 2024
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 24 m²
19since energy certificates began (2008)
1in PE2 8PD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
38hours of spills in 2025 between them (typical neighbourhood: about 36)
7spill events counted
- Anglian Water
Thistle Drive Psinto Trib Kings Dyke6 spills, 37 hours in 2025
600 m away - Anglian Water
Horsey Toll Pumping Stationinto River Nene (Old Course)1 spills, 1 hours in 2025
1.7 km away - Anglian Water
Peteborough North Minster Csointo The River Nene0 spills, 0 hours in 2025
1.5 km away - Anglian Water
Sherwood Avenue Ssointo Fletton Spring0 spills, 0 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
29 planned, approved or being built and 8 running (51 MW between them). Those within 5 km are on the map above.
- Battery storage
Third Drove, Fengate - Battery StorageApproved, not yet built · 50 MW
Jan 2023
2.1 km away - Battery storage
Inclusive, Titan Drive - Micro Energy storage facilityApproved, not yet built · 200 kW
Sept 2024
2.2 km away - Rooftop solar
Kiddicare, Club Way - Solar PanlesApproved, not yet built · 960 kW
May 2024
2.4 km away - Battery storage
Vicarage Farm - Energy Storage SystemApproved, not yet built · 200 kW
Oct 2025
2.7 km away - Rooftop solar
J S Davidson Limited, Shrewsbury Avenue - Solar PV panelsApproved, not yet built · 1 MW
Sept 2024
2.7 km away - Solar farm
Perkins Engines, Fengate - Solar FarmApproved, not yet built · 1 MW
Mar 2022
3.2 km away - Rooftop solar
Imperial Way, Eagle Business Park - Solar PV SystemApproved, not yet built · 350 kW
Nov 2024
3.5 km away - Rooftop solar
Peterborough Regional College, Park Crescent - Solar PanelsApproved, not yet built · 590 kW
Dec 2025
3.5 km away - Battery storage
Kings Dyke, Whittlesey - Battery Energy StorageApproved, not yet built · 10 MW
May 2025
3.8 km away - Rooftop solar
Nene Park Academy, Orton Longueville - Photovoltaic PanelsApproved, not yet built · 280 kW
Oct 2022
4.1 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
St George Avenue, PeterboroughUtility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Give and take
Oct 2026 to Oct 2026
600 m away - Minor
Frank Perkins Parkway, PeterboroughHighway repair and maintenance works · PETERBOROUGH CITY COUNCIL · Lane closure
Nov 2026 to Nov 2026
350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A47 Wansford to SuttonHighways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023
11.9 km away - Examination
Meridian Solar FarmGenerating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026
19.6 km away - Decideddecided Jul 2013
19.9 km away - Decideddecided Jan 2023
20.3 km away - Decided
Mallard Pass Solar ProjectGenerating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024
21.5 km away - Pre-application
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028
22.3 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Peterborough EfW (energy from waste, 2.5 km); McCain Foods AD Plant (AD) (anaerobic digestion, 3.3 km); Whittlesey (wind farm, 3.5 km); Dogsthorpe South Landfill Site (landfill gas, 5.1 km); Black Bush Farm (solar farm, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.