Country England and Wales › Region East of England › Council Peterborough › Neighbourhood Fletton › Postcode PE2 8JN What's changing near PE2 8JN Within 2 km, around Fletton in Peterborough. Building, planning, schools, transport, prices and crime.
512 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.5% like-for-like prices in Fletton, 2024 → 2025 (council +1.0%)
+6% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 34 new homes completed flats · May 2026
May 2026 800 m away New homes 66 new homes completed flats · May 2026
May 2026 800 m away New homes 90 new homes completed flats · Nov 2025
Dec 2025 1.4 km away New homes 48 new homes completed flats · Oct 2025 – Nov 2025
Nov 2025 1.4 km away New homes 26 new homes completed flats · Sep 2025
Sept 2025 1.8 km away New homes 19 new homes completed flats · Sep 2025
Sept 2025 1.8 km away New homes 5 new homes completed flats · Sep 2025
Sept 2025 2.0 km away New homes 11 new homes completed flats · Jan 2025 – Apr 2025
Apr 2025 1.4 km away New homes 14 new homes completed flats · Apr 2025
Apr 2025 1.4 km away New homes 11 new homes completed flats · Apr 2025
Apr 2025 1.4 km away New homes 81 new homes completed flats · Jan 2025 – Apr 2025
Apr 2025 1.4 km away New homes 67 new homes completed flats · Jan 2025 – Feb 2025
Feb 2025 1.4 km away New homes 6 homes extended 2021–2025, typically adding 26 m²
14 since energy certificates began (2008)
2 in PE2 8JN itself
Extended certificate 2026 Extended certificate 2024 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 5 storm overflows within 2 km
41 hours of spills in 2025 between them (typical neighbourhood: about 36)
15 spill events counted
Anglian Water Thistle Drive Ps into Trib Kings Dyke 6 spills, 37 hours in 2025
900 m away Anglian Water Peterborough Oundle Road Cso into River Nene 3 spills, 3 hours in 2025
1.2 km away Anglian Water Peterborough River Lane Cso into The River Nene 6 spills, 1 hours in 2025
1.3 km away Anglian Water Peteborough North Minster Cso into The River Nene 0 spills, 0 hours in 2025
500 m away Anglian Water Sherwood Avenue Sso into Fletton Spring 0 spills, 0 hours in 2025
1.1 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 29 planned, approved or being built and 8 running (51 MW between them). Those within 5 km are on the map above.
Battery storage Inclusive, Titan Drive - Micro Energy storage facility Approved, not yet built · 200 kW
Sept 2024 1.8 km away Battery storage Third Drove, Fengate - Battery Storage Approved, not yet built · 50 MW
Jan 2023 1.9 km away Battery storage Vicarage Farm - Energy Storage System Approved, not yet built · 200 kW
Oct 2025 2.1 km away Solar farm Perkins Engines, Fengate - Solar Farm Approved, not yet built · 1 MW
Mar 2022 2.5 km away Rooftop solar Peterborough Regional College, Park Crescent - Solar Panels Approved, not yet built · 590 kW
Dec 2025 2.6 km away Rooftop solar Kiddicare, Club Way - Solar Panles Approved, not yet built · 960 kW
May 2024 2.6 km away Rooftop solar J S Davidson Limited, Shrewsbury Avenue - Solar PV panels Approved, not yet built · 1 MW
Sept 2024 2.6 km away Solar farm Dogsthorpe, Welland Road - Solar Farm & Battery Storage Approved, not yet built · 14 MW
Jun 2024 3.7 km away Battery storage Dogsthorpe, Welland Road - Solar Farm & Battery Storage Approved, not yet built
Jun 2024 3.7 km away Rooftop solar Nene Park Academy, Orton Longueville - Photovoltaic Panels Approved, not yet built · 280 kW
Oct 2022 3.8 km away Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major, planned Potters Way, Peterborough Highway improvement works · PETERBOROUGH CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 800 m away Major Potters Way, Peterborough Highway improvement works · PETERBOROUGH CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 800 m away Major Potters Way, Peterborough Highway improvement works · PETERBOROUGH CITY COUNCIL · Multi-way signals
Sept 2026 to Oct 2026 800 m away Minor Bishops Road, Peterborough Utility repair and maintenance works · ANGLIAN WATER · Lane closure
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided A47 Wansford to Sutton Highways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023 11.2 km away Examination Meridian Solar Farm Generating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026 19.1 km away Decided decided Jul 2013 19.3 km away Decided decided Jan 2023 19.7 km away Decided Mallard Pass Solar Project Generating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024 20.5 km away Pre-application Fens Reservoir Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028 23.1 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Peterborough EfW (energy from waste, 2.1 km); McCain Foods AD Plant (AD) (anaerobic digestion, 3.8 km); Whittlesey (wind farm, 4.0 km); Dogsthorpe South Landfill Site (landfill gas, 4.2 km); Dogsthorpe South Landfill Site 2 (landfill gas, 4.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.