Country England and Wales › Region East of England › Council Peterborough › Neighbourhood Stanground › Postcode PE2 8JD What's changing near PE2 8JD Within 2 km, around Stanground in Peterborough. Building, planning, schools, transport, prices and crime.
187 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.6% like-for-like prices in Stanground, 2024 → 2025 (council +1.0%)
-15% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 34 new homes completed flats · May 2026
May 2026 1.5 km away New homes 66 new homes completed flats · May 2026
May 2026 1.5 km away New homes 48 new homes completed flats · Oct 2025 – Nov 2025
Nov 2025 2.0 km away New homes 8 new homes completed houses · Jan 2025
Jan 2025 300 m away New homes 18 new homes completed flats · Jan 2025
Jan 2025 300 m away New school Sept 2024 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
6 homes extended 2021–2025, typically adding 27 m²
14 since energy certificates began (2008)
2 in PE2 8JD itself
Extended certificate 2026 Extended certificate 2019 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 9 storm overflows within 2 km
617 hours of spills in 2025 between them (typical neighbourhood: about 36)
80 spill events counted
Anglian Water Peterborough - Flag Fen Wrc into Counterdrain River Nene T 31 spills, 418 hours in 2025
1.9 km away Anglian Water Peterborough - Flag Fen Wrc into Counterdrain River Nene T 30 spills, 137 hours in 2025
1.9 km away Anglian Water Thistle Drive Ps into Trib Kings Dyke 6 spills, 37 hours in 2025
350 m away Anglian Water Flag Fen Inlet Pumping Station into The Counter Drain 3 spills, 21 hours in 2025
1.9 km away Anglian Water Peterborough Oundle Road Cso into River Nene 3 spills, 3 hours in 2025
1.8 km away Anglian Water Peterborough River Lane Cso into The River Nene 6 spills, 1 hours in 2025
1.9 km away Anglian Water Horsey Toll Pumping Station into River Nene (Old Course) 1 spills, 1 hours in 2025
1.9 km away Anglian Water Peteborough North Minster Cso into The River Nene 0 spills, 0 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 29 planned, approved or being built and 8 running (51 MW between them). Those within 5 km are on the map above.
Battery storage Third Drove, Fengate - Battery Storage Approved, not yet built · 50 MW
Jan 2023 1.8 km away Battery storage Inclusive, Titan Drive - Micro Energy storage facility Approved, not yet built · 200 kW
Sept 2024 1.9 km away Battery storage Vicarage Farm - Energy Storage System Approved, not yet built · 200 kW
Oct 2025 2.3 km away Rooftop solar Kiddicare, Club Way - Solar Panles Approved, not yet built · 960 kW
May 2024 2.5 km away Rooftop solar J S Davidson Limited, Shrewsbury Avenue - Solar PV panels Approved, not yet built · 1 MW
Sept 2024 2.8 km away Solar farm Perkins Engines, Fengate - Solar Farm Approved, not yet built · 1 MW
Mar 2022 2.8 km away Rooftop solar Peterborough Regional College, Park Crescent - Solar Panels Approved, not yet built · 590 kW
Dec 2025 3.1 km away Battery storage Kings Dyke, Whittlesey - Battery Energy Storage Approved, not yet built · 10 MW
May 2025 3.9 km away Rooftop solar Imperial Way, Eagle Business Park - Solar PV System Approved, not yet built · 350 kW
Nov 2024 3.9 km away Rooftop solar Nene Park Academy, Orton Longueville - Photovoltaic Panels Approved, not yet built · 280 kW
Oct 2022 4.1 km away Road and street works within 1 km 2 permitted works running now or planned.
Standard St George Avenue, Peterborough Utility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Give and take
Oct 2026 to Oct 2026 950 m away Minor Frank Perkins Parkway, Peterborough Highway repair and maintenance works · PETERBOROUGH CITY COUNCIL · Lane closure
Nov 2026 to Nov 2026 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided A47 Wansford to Sutton Highways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023 11.8 km away Examination Meridian Solar Farm Generating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026 19.3 km away Decided decided Jul 2013 19.8 km away Decided decided Jan 2023 20.2 km away Decided Mallard Pass Solar Project Generating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024 21.2 km away Pre-application Fens Reservoir Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028 22.5 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Peterborough EfW (energy from waste, 2.2 km); McCain Foods AD Plant (AD) (anaerobic digestion, 3.3 km); Whittlesey (wind farm, 3.5 km); Dogsthorpe South Landfill Site (landfill gas, 4.7 km); Dogsthorpe South Landfill Site 2 (landfill gas, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.