What's changing near PE2 8AU
Within 2 km, around Fletton in Peterborough. Building, planning, schools, transport, prices and crime.
520new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.5%like-for-like prices in Fletton, 2024 → 2025 (council +1.0%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
34 new homes completedflats · May 2026
May 2026
650 m away - New homes
66 new homes completedflats · May 2026
May 2026
650 m away - New homes
90 new homes completedflats · Nov 2025
Dec 2025
800 m away - New homes
48 new homes completedflats · Oct 2025 – Nov 2025
Nov 2025
750 m away - New homes
26 new homes completedflats · Sep 2025
Sept 2025
1.9 km away - New homes
19 new homes completedflats · Sep 2025
Sept 2025
1.9 km away - New homes
5 new homes completedflats · Sep 2025
Sept 2025
2.0 km away - New homes
11 new homes completedflats · Jan 2025 – Apr 2025
Apr 2025
1.5 km away - New homes
14 new homes completedflats · Apr 2025
Apr 2025
1.5 km away - New homes
11 new homes completedflats · Apr 2025
Apr 2025
1.5 km away - New homes
81 new homes completedflats · Jan 2025 – Apr 2025
Apr 2025
1.5 km away - New homes
67 new homes completedflats · Jan 2025 – Feb 2025
Feb 2025
1.5 km away - New homes
18homes extended 2021–2025, typically adding 22 m²
41since energy certificates began (2008)
2in PE2 8AU itself
- Extendedcertificate 2016
- Extendedcertificate 2013
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
41hours of spills in 2025 between them (typical neighbourhood: about 36)
15spill events counted
- Anglian Water
Thistle Drive Psinto Trib Kings Dyke6 spills, 37 hours in 2025
1.6 km away - Anglian Water
Peterborough Oundle Road Csointo River Nene3 spills, 3 hours in 2025
800 m away - Anglian Water
Peterborough River Lane Csointo The River Nene6 spills, 1 hours in 2025
900 m away - Anglian Water
Sherwood Avenue Ssointo Fletton Spring0 spills, 0 hours in 2025
350 m away - Anglian Water
Peteborough North Minster Csointo The River Nene0 spills, 0 hours in 2025
750 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
29 planned, approved or being built and 6 running (23 MW between them). Those within 5 km are on the map above.
- Rooftop solar
J S Davidson Limited, Shrewsbury Avenue - Solar PV panelsApproved, not yet built · 1 MW
Sept 2024
1.8 km away - Rooftop solar
Kiddicare, Club Way - Solar PanlesApproved, not yet built · 960 kW
May 2024
2.0 km away - Battery storage
Inclusive, Titan Drive - Micro Energy storage facilityApproved, not yet built · 200 kW
Sept 2024
2.6 km away - Battery storage
Third Drove, Fengate - Battery StorageApproved, not yet built · 50 MW
Jan 2023
2.7 km away - Battery storage
Vicarage Farm - Energy Storage SystemApproved, not yet built · 200 kW
Oct 2025
2.8 km away - Rooftop solar
Peterborough Regional College, Park Crescent - Solar PanelsApproved, not yet built · 590 kW
Dec 2025
2.9 km away - Rooftop solar
Nene Park Academy, Orton Longueville - Photovoltaic PanelsApproved, not yet built · 280 kW
Oct 2022
3.0 km away - Solar farm
Perkins Engines, Fengate - Solar FarmApproved, not yet built · 1 MW
Mar 2022
3.1 km away - Solar farm
Dogsthorpe, Welland Road - Solar Farm & Battery StorageApproved, not yet built · 14 MW
Jun 2024
3.9 km away - Battery storage
Dogsthorpe, Welland Road - Solar Farm & Battery StorageApproved, not yet built
Jun 2024
3.9 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major, planned
Oundle Road, PeterboroughUtility asset works · BT · Lane closure
Jan 2027 to Jan 2027
500 m away - Minor
Cubitt Way, PeterboroughUtility asset works · BT · Multi-way signals
Jan 2027 to Jan 2027
550 m away - Minor
Bishops Road, PeterboroughUtility repair and maintenance works · ANGLIAN WATER · Lane closure
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
A47 Wansford to SuttonHighways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023
10.5 km away - Decideddecided Jul 2013
18.6 km away - Decideddecided Jan 2023
19.0 km away - Examination
Meridian Solar FarmGenerating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026
19.8 km away - Decided
Mallard Pass Solar ProjectGenerating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024
20.1 km away - Pre-application
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028
23.7 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Peterborough EfW (energy from waste, 2.9 km); McCain Foods AD Plant (AD) (anaerobic digestion, 4.5 km); Dogsthorpe South Landfill Site (landfill gas, 4.6 km); Dogsthorpe South Landfill Site 2 (landfill gas, 4.7 km); Whittlesey (wind farm, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.