Country England and Wales › Region East of England › Council Huntingdonshire › Neighbourhood Warboys & Bury › Postcode PE28 2SX What's changing near PE28 2SX Within 2 km, around Warboys & Bury in Huntingdonshire. Building, planning, schools, transport, prices and crime.
7 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-0.8% like-for-like prices in Warboys & Bury, 2024 → 2025 (council +2.6%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 22 m²
18 since energy certificates began (2008)
1 in PE28 2SX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
5 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 13 planned, approved or being built and 11 running (87 MW between them). Those within 5 km are on the map above.
Biomass Old Brick Works (Station Road, Warboys) Approved, not yet built · 2 MW
Feb 2018 1.6 km away Wind farm Tick Fen Farm, Puddock Road - Wind Turbine Approved, not yet built · 500 kW
Jul 2025 3.9 km away Wind farm Tick Fen Farm, Puddock Road - Wind Turbine Approved, not yet built · 500 kW
Dec 2024 4.1 km away Solar farm Little Staughton Solar Farm Approved, not yet built · 50 MW
Dec 2024 5.1 km away Rooftop solar Colne Fen Farm, Chatteris Road - Solar Panels Approved, not yet built · 500 kW
Apr 2024 7.3 km away Solar farm One Leisure Indoor, Westwood Road - Solar Car Park Canopies Approved, not yet built
Jan 2025 8.4 km away Rooftop solar Bridge Farm, Drove Colne - Solar PV Panels Approved, not yet built · 200 kW
Nov 2025 8.5 km away Rooftop solar Needingworth Road - Solar Photovoltaic Array Approved, not yet built · 370 kW
Jan 2022 8.7 km away Battery storage Meadow Lane Park and Ride Being built
Mar 2022 9.3 km away Solar farm Meadow Lane Park and Ride Being built · 900 kW
Mar 2022 9.3 km away Rooftop solar Latham Road - Solar Panels
Road and street works within 1 km 6 permitted works running now or planned, 6 of them major.
Major, planned Ramsey Road, Warboys Highway improvement works · CAMBRIDGESHIRE COUNTY COUNCIL · Two-way signals
Sept 2026 to Dec 2026 300 m away Major Ramsey Road, Warboys Highway improvement works · CAMBRIDGESHIRE COUNTY COUNCIL · Two-way signals
Sept 2026 to Dec 2026 300 m away Major, planned Ramsey Road, Warboys Highway improvement works · CAMBRIDGESHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Dec 2026 300 m away Major Ramsey Road, Warboys Highway improvement works · CAMBRIDGESHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Dec 2026 300 m away Major, planned Ramsey Road, Warboys Highway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 900 m away Major Ramsey Road, Warboys Highway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Pre-application application due July 2027 9.1 km away Pre-application Fens Reservoir Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028 13.8 km away Decided decided May 2016 14.5 km away Pre-application application due August 2027 20.3 km away Decided decided Aug 2022 21.6 km away Recommendation East Park Energy Generating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station. application due September 2025 26.1 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Red Tile (wind farm, 4.5 km); Ramsey 1 (wind farm, 4.9 km); Lodge Farm (solar farm, 5.1 km); Wiggin Hill Solar Farm - Phase 2 (solar farm, 5.5 km); Wiggin Hill Solar Farm - Phase 1 (solar farm, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.