Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
16hours of spills in 2025 between them (typical neighbourhood: about 36)
10spill events counted
Anglian Water
Peterborough-Orton Mere Psinto Trib River Nene1 spills, 12 hours in 2025
1.1 km away
Anglian Water
Peterborough Oundle Road Csointo River Nene3 spills, 3 hours in 2025
2.0 km away
Anglian Water
Peterborough River Lane Csointo The River Nene6 spills, 1 hours in 2025
2.0 km away
Anglian Water
Sherwood Avenue Ssointo Fletton Spring0 spills, 0 hours in 2025
Third Drove, Fengate - Battery StorageApproved, not yet built · 50 MW
Jan 2023 4.5 km away
Battery storage
Vicarage Farm - Energy Storage SystemApproved, not yet built · 200 kW
Oct 2025 4.6 km away
Running nearest: Peterborough EfW (energy from waste, 4.7 km); Dogsthorpe South Landfill Site (landfill gas, 5.9 km); Dogsthorpe South Landfill Site 2 (landfill gas, 6.0 km); McCain Foods AD Plant (AD) (anaerobic digestion, 6.2 km); Whittlesey (wind farm, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Chatteris Wind FarmGenerating Stations · Located south of Chatteris, in East Anglia
application due July 2027 27.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.