Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
42hours of spills in 2025 between them (typical neighbourhood: about 36)
42spill events counted
Anglian Water
Boston London Road Pumping Stationinto The Haven (Estuary)22 spills, 18 hours in 2025
1.8 km away
Anglian Water
Boston Queens Road Csointo Maud Foster Drain6 spills, 15 hours in 2025
1.8 km away
Anglian Water
Boston Sleaford Road Psinto North Forty Foot Drain9 spills, 7 hours in 2025
700 m away
Anglian Water
Boston Norfolk Place Csointo The Haven3 spills, 1 hours in 2025
1000 m away
Anglian Water
Norfolk Street Csointo Maud Foster Drain1 spills, 1 hours in 2025
1.7 km away
Anglian Water
Fenside Road Pumping Stationinto North Forty Foot Drain1 spills, 0 hours in 2025
11 planned, approved or being built and 10 running (47 MW between them). Those within 5 km are on the map above.
Battery storage
Boston West Business Park - Micro Energy StoragePlanning application in · 200 kW
Feb 2026 1.0 km away
Energy from waste
Boston Alternative Energy Facility (BAEF)Approved, not yet built · 102 MW
Jul 2023 2.4 km away
Rooftop solar
Riverside Industrial Estate - Solar PV PanelsApproved, not yet built · 890 kW
Jun 2022 2.7 km away
Rooftop solar
Greenyard Frozen, Marsh Lane - Solar PanelsApproved, not yet built · 450 kW
May 2023 2.9 km away
Rooftop solar
Marsh Lane - Solar PV PanelsBeing built · 890 kW
Oct 2022 2.9 km away
Solar farm
Boston Landfill, Wyberton - Solar PV ArrayBeing built · 10 MW
Dec 2023 4.3 km away
Anaerobic digestion
Staples Vegetables Limited, Station Farm - Anaerobic Digestion PlantApproved, not yet built
Jun 2023 7.6 km away
Solar farm
Mallows Lane - Solar Farm & Battery StorageApproved, not yet built · 10 MW
Dec 2022 8.0 km away
Battery storage
Mallows Lane - Solar Farm & Battery StorageApproved, not yet built · 5 MW
Dec 2022 8.0 km away
Rooftop solar
Station Road, Swineshead - Solar PV SystemApproved, not yet built · 250 kW
Dec 2021 9.2 km away
Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Eastern Green Link 3 and Eastern Green Link 4Electric Lines · Land between the Scotland/England Maritime boundary in the North Sea and the Walpole area of Kings Lynn and West Norfolk, Norfolk, with a landfall on the east coast of Lincolnshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decided
Springwell Solar FarmGenerating Stations · The Site is located within the administrative boundary of North Kesteven District Council and in the County of Lincolnshire.
decided Apr 2026 28.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.