Country England and Wales › Region East of England › Council Peterborough › Neighbourhood Millfield & Bourges Boulevard › Postcode PE1 3HS What's changing near PE1 3HS Within 2 km, around Millfield & Bourges Boulevard in Peterborough. Building, planning, schools, transport, prices and crime.
12 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.5% like-for-like prices in Millfield & Bourges Boulevard, 2024 → 2025 (council +1.0%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
29 homes extended 2021–2025, typically adding 24 m²
48 since energy certificates began (2008)
1 in PE1 3HS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
0 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 26 planned, approved or being built and 6 running (23 MW between them). Those within 5 km are on the map above.
Solar farm Dogsthorpe, Welland Road - Solar Farm & Battery Storage Approved, not yet built · 14 MW
Jun 2024 900 m away Battery storage Dogsthorpe, Welland Road - Solar Farm & Battery Storage Approved, not yet built
Jun 2024 900 m away Rooftop solar F P Smith Motors, Sturrock Way - Solar PV System Approved, not yet built · 200 kW
May 2023 1.2 km away Rooftop solar Peterborough Regional College, Park Crescent - Solar Panels Approved, not yet built · 590 kW
Dec 2025 2.0 km away Rooftop solar Baker Perkins, Manor Drive - Solar Panels Approved, not yet built · 1 MW
Sept 2025 2.0 km away Battery storage Lincoln Road - Energy Storage System Approved, not yet built · 200 kW
Oct 2025 2.2 km away Battery storage Rightwell West, Bretton - Micro Energy Storage Approved, not yet built · 200 kW
Nov 2025 2.3 km away Rooftop solar Stirling Way, Bretton - Solar Panels Approved, not yet built · 250 kW
Nov 2024 2.3 km away Rooftop solar Coningsby Business Park, Stirling Way - Solar Panels Approved, not yet built · 300 kW
Jul 2025 2.3 km away Rooftop solar Coningsby Business Park, Stirling Way - Solar Panels Approved, not yet built · 1 MW
Apr 2024 2.3 km away Road and street works within 1 km 14 permitted works running now or planned, 9 of them major.
Major, planned Searjeant Street, Peterborough Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Road closure
Nov 2026 to Nov 2026 950 m away Major Searjeant Street, Peterborough Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Road closure
Nov 2026 to Nov 2026 950 m away Major, planned Searjeant Street, Peterborough Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Road closure
Nov 2026 to Nov 2026 950 m away Major Searjeant Street, Peterborough Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Road closure
Nov 2026 to Nov 2026 950 m away Major, planned Searjeant Street, Peterborough Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Road closure
Nov 2026 to Nov 2026 950 m away Major Searjeant Street, Peterborough Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Road closure
Nov 2026 to Nov 2026 950 m away Major, planned Searjeant Street, Peterborough Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Road closure
Nov 2026 to Nov 2026 950 m away Major, planned Clarence Road, Peterborough Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Road closure
Nov 2026 to Nov 2026 1000 m away Major infrastructure projects within 30 km Decided A47 Wansford to Sutton Highways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023 9.6 km away Decided Mallard Pass Solar Project Generating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024 16.9 km away Examination Meridian Solar Farm Generating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026 17.4 km away Decided decided Jul 2013 17.5 km away Decided decided Jan 2023 17.9 km away Pre-application Fens Reservoir Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028 26.2 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Dogsthorpe South Landfill Site (landfill gas, 2.2 km); Dogsthorpe South Landfill Site 2 (landfill gas, 2.3 km); Peterborough EfW (energy from waste, 4.0 km); McCain Foods AD Plant (AD) (anaerobic digestion, 6.8 km); Whittlesey (wind farm, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.