Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Longmarsh Green EnergyGenerating Stations · The site boundary spans from the existing National Grid (NGET) Grid Supply Point (GSP) at Walpole in the west to the south of the village of Barton Bendish in the east, extending circa 29km north-west to south-east.
Poplar Farm, Old Fendyke - Solar PanelsApproved, not yet built · 690 kW
Jul 2023 7.8 km away
Battery storage
Lapwing Fen II, Crown FarmApproved, not yet built · 50 MW
Mar 2020 7.9 km away
Running nearest: Long Sutton Butterfly And Wildlife Park (solar farm, 900 m); Long Sutton Butterfly And Wildlife Park (extension) (solar farm, 950 m); The Grange Wind Farm (wind farm, 5.1 km); Gedney Marsh (wind farm, 5.4 km); Sutton Bridge Solar Farm (solar farm, 5.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Eastern Green Link 3 and Eastern Green Link 4Electric Lines · Land between the Scotland/England Maritime boundary in the North Sea and the Walpole area of Kings Lynn and West Norfolk, Norfolk, with a landfall on the east coast of Lincolnshire.
application due October 2026 24.3 km away
Decided
Triton Knoll Electrical SystemElectric Lines · 33km off the Lincolnshire coast to the Triton Knoll Substation in Lincolnshire
decided Sept 2016 27.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.