Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
54hours of spills in 2025 between them (typical neighbourhood: about 36)
8spill events counted
Anglian Water
Holbeach Water Recycling Centreinto Holbeach River8 spills, 54 hours in 2025
Eastern Green Link 3 and Eastern Green Link 4Electric Lines · Land between the Scotland/England Maritime boundary in the North Sea and the Walpole area of Kings Lynn and West Norfolk, Norfolk, with a landfall on the east coast of Lincolnshire.
Longmarsh Green EnergyGenerating Stations · The site boundary spans from the existing National Grid (NGET) Grid Supply Point (GSP) at Walpole in the west to the south of the village of Barton Bendish in the east, extending circa 29km north-west to south-east.
application due April 2027 27.7 km away
Pre-application
Lincolnshire ReservoirDams and Reservoirs · 7km southwest of Sleaford, between the settlements of Swaton, Scredington and Helpringham
application due November 2028 28.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.