Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Eastern Green Link 3 and Eastern Green Link 4Electric Lines · Land between the Scotland/England Maritime boundary in the North Sea and the Walpole area of Kings Lynn and West Norfolk, Norfolk, with a landfall on the east coast of Lincolnshire.
application due October 2026 21.8 km away
Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Long Sutton West, Gedney & Holbeach Hurn: +26% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.
Sutton Bridge Solar Farm - Walpole Battery StorageApproved, not yet built
Apr 2025 9.0 km away
Solar farm
Gunthorpe Road, Marsh - Solar FarmApproved, not yet built · 50 MW
Sept 2023 9.6 km away
Running nearest: Long Sutton Butterfly And Wildlife Park (solar farm, 3.9 km); Long Sutton Butterfly And Wildlife Park (extension) (solar farm, 4.0 km); Manor Farm (Farm AD) (anaerobic digestion, 4.2 km); Gedney Marsh (wind farm, 4.7 km); Grange Farm (Lincolnshire) (solar farm, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Longmarsh Green EnergyGenerating Stations · The site boundary spans from the existing National Grid (NGET) Grid Supply Point (GSP) at Walpole in the west to the south of the village of Barton Bendish in the east, extending circa 29km north-west to south-east.
application due April 2027 23.4 km away
Decided
Triton Knoll Electrical SystemElectric Lines · 33km off the Lincolnshire coast to the Triton Knoll Substation in Lincolnshire
decided Sept 2016 24.9 km away
Decided
Heckington Fen Solar ParkGenerating Stations · The site is located on land to the north of East Heckington and 3.5km south east of South Kyme.
decided Jan 2025 29.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.