Country England and Wales › Region East Midlands › Council South Kesteven › Neighbourhood Langtoft, Thurlby & Uffington › Postcode PE10 0HW What's changing near PE10 0HW Within 2 km, around Langtoft, Thurlby & Uffington in South Kesteven. Building, planning, schools, transport, prices and crime.
59 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.3% like-for-like prices in Langtoft, Thurlby & Uffington, 2024 → 2025 (council +1.3%)
+32% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 12 new homes completed houses · Jun 2026 – Sep 2026
Sept 2026 1.9 km away New homes 11 new homes completed houses · Aug 2025 – Jun 2026
Jun 2026 2.0 km away New homes 22 new homes completed 4 flats, 18 houses · May 2025 – Mar 2026
Mar 2026 1.9 km away New homes 8 new homes completed houses · Nov 2024 – Jul 2025
Jul 2025 1.9 km away New school Jan 2020 800 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 33 m²
14 since energy certificates began (2008)
1 in PE10 0HW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 6 planned, approved or being built and 1 running (5 MW between them). Those within 5 km are on the map above.
Solar farm Northorpe Fen Farm, Fen Road - Solar Farm Approved, not yet built · 15 MW
Dec 2025 1000 m away Rooftop solar Kellington House, South Fen Road - Solar Panels Approved, not yet built · 150 kW
Mar 2023 3.7 km away Solar farm Home Farm - Solar PV Farm Approved, not yet built · 28 MW
Mar 2025 4.7 km away Solar farm Limes Farm Solar Farm & Battery Energy Storage Approved, not yet built · 20 MW
May 2025 6.3 km away Battery storage Limes Farm Solar Farm & Battery Energy Storage Approved, not yet built
May 2025 6.3 km away Solar farm Mallard Pass Solar Farm Approved, not yet built · 350 MW
Jul 2024 7.9 km away Running nearest: Limes Farm Solar Farm (solar farm, 4.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Mallard Pass Solar Project Generating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine. decided Jul 2024 7.9 km away Decided A47 Wansford to Sutton Highways · Location is west of the A1 Peterborough near Wansford and close to the village of Sutton. decided Feb 2023 18.2 km away Decided decided Jul 2013 19.9 km away Decided decided Jan 2023 20.1 km away Examination Meridian Solar Farm Generating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech. application due March 2026 21.2 km away Pre-application Lincolnshire Reservoir Dams and Reservoirs · 7km southwest of Sleaford, between the settlements of Swaton, Scredington and Helpringham application due November 2028 22.1 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.