What's changing near OX11 7PQ
Within 2 km, around Didcot Ladygrove in South Oxfordshire. Building, planning, schools, transport, prices and crime.
630new homes completed within 2 km, last 2 years
17homes given permission on brownfield sites since 2021
+1.4%like-for-like prices in Didcot Ladygrove, 2024 → 2025 (council +1.4%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
8 new homes completedhouses · Feb 2026 – Oct 2026
planned Oct 2026
1.5 km away - New homes
8 new homes completedhouses · Dec 2025 – Oct 2026
planned Oct 2026
800 m away - New homes
26 new homes completed1 flats, 25 houses · Mar 2025 – Oct 2026
planned Oct 2026
700 m away - New homes
30 new homes completed18 flats, 12 houses · Nov 2024 – Oct 2026
planned Oct 2026
850 m away - New homes
40 new homes completed6 flats, 34 houses · Oct 2025 – Oct 2026
Oct 2026
1.5 km away - New homes
30 new homes completed1 flats, 29 houses · Oct 2025 – Sep 2026
Sept 2026
750 m away - New homes
9 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
10 new homes completedhouses · Sep 2026
Sept 2026
1.4 km away - New homes
26 new homes completedhouses · Jun 2025 – Sep 2026
Sept 2026
750 m away - New homes
26 new homes completed19 flats, 7 houses · Sep 2025 – Aug 2026
Aug 2026
650 m away - New homes
28 new homes completed10 flats, 18 houses · May 2025 – Aug 2026
Aug 2026
350 m away - New homes
11 new homes completed
14homes extended 2021–2025, typically adding 26 m²
34since energy certificates began (2008)
0in OX11 7PQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
339hours of spills in 2025 between them (typical neighbourhood: about 36)
26spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
26 planned, approved or being built and 13 running (469 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sainsburys Supermarkets, Central Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2024
900 m away - Battery storage
Appleford - Battery Energy StorageApproved, not yet built · 300 MW
Aug 2025
2.1 km away - Battery storage
The Sutton Courtenay Waste Management Site, Appleford SidingsApproved, not yet built
Jul 2025
2.7 km away - Rooftop solar
Rebellion Film Studios, Milton Road - Solar PanelsApproved, not yet built · 880 kW
Jan 2023
3.1 km away - Rooftop solar
Hachette UK Distribution Centre, Milton Road - Solar PanelsApproved, not yet built · 870 kW
Nov 2024
3.4 km away - Rooftop solar
Milton Park, Milton - Solar PanelsApproved, not yet built · 300 kW
Mar 2025
3.8 km away - Rooftop solar
Brook Drive, Milton Park - Solar PanelsApproved, not yet built
Jun 2025
3.8 km away - Solar farm
Appleford Sidings, Sutton Courtenay - Solar Photovoltaic ArrayPlanning application in · 24 MW
May 2021
4.2 km away - Battery storage
Appleford Sidings, Sutton Courtenay - Battery StoragePlanning application in
May 2021
4.2 km away - Rooftop solar
Culham Science Centre, Building E4, E5 & E6, Clifton Hampden - Solar PanelsApproved, not yet built · 190 kW
May 20234.7 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due November 2026
8.8 km away - Decision
Botley West Solar FarmGenerating Stations · Land in West Oxfordshire, Cherwell and Vale of White Horse Districts, across approx 1400 hectares application due by 15 November 2024
23.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Sutton Courtney (landfill gas, 2.6 km); Sutton Courtenay Landfill Scheme (landfill gas, 3.1 km); EFDA JJET Fusion Flywheel (other, 4.8 km); Wally Corner Landfill Site (solar farm, 6.7 km); Avon Road Car Park - Solar Photovoltaic Carport System (rooftop solar, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.