What's changing near OX10 0JZ
Within 2 km, around Wallingford & Brightwell in South Oxfordshire. Building, planning, schools, transport, prices and crime.
229new homes completed within 2 km, last 2 years
13homes given permission on brownfield sites since 2021
+0.6%like-for-like prices in Wallingford & Brightwell, 2024 → 2025 (council +1.4%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
34 new homes completed17 flats, 17 houses · Jan 2026 – Sep 2026
Sept 2026
1.1 km away - New homes
14 new homes completed1 flats, 13 houses · Jun 2026 – Aug 2026
Aug 2026
1.2 km away - New homes
5 new homes completedhouses · Jul 2026
Jul 2026
950 m away - New homes
8 new homes completedhouses · Oct 2025 – Jul 2026
Jul 2026
850 m away - New homes
22 new homes completed9 flats, 13 houses · Apr 2026 – Jun 2026
Jun 2026
1.1 km away - New homes
7 new homes completed3 flats, 4 houses · Apr 2025 – Mar 2026
Mar 2026
1.3 km away - New homes
29 new homes completed2 flats, 27 houses · Dec 2024 – Mar 2026
Mar 2026
1.3 km away - New homes
12 new homes completed2 flats, 10 houses · Aug 2025 – Feb 2026
Feb 2026
1.3 km away - New homes
13 new homes completedhouses · Jul 2025 – Nov 2025
Nov 2025
850 m away - New homes
7 new homes completedhouses · Mar 2025 – Nov 2025
Nov 2025
1.3 km away - New homes
6 new homes completedhouses · Mar 2025 – Aug 2025
Aug 2025
850 m away - New homes
34 new homes completedflats · Mar 2025 – Jun 2025
20homes extended 2021–2025, typically adding 29 m²
56since energy certificates began (2008)
2in OX10 0JZ itself
- Extendedcertificate 2023
- Extendedcertificate 2012
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
14 planned, approved or being built and 9 running (448 MW between them). Those within 5 km are on the map above.
- Solar farm
Benson Lane, Crowmarsh - Solar ArrayApproved, not yet built
Apr 2023
1.5 km away - Rooftop solar
Wallingford AD Plant, Benson Lane - Solar panelsApproved, not yet built · 180 kW
Jul 2025
2.1 km away - Solar farm
Icknield Road, Ipsden - Solar Array & Battery StorageApproved, not yet built · 1 MW
Dec 2022
5.9 km away - Battery storage
Icknield Road, Ipsden - Solar Array & Battery StorageApproved, not yet built
Dec 2022
5.9 km away - Rooftop solar
Sainsburys Supermarkets, Central Drive - Solar PanelsApproved, not yet built · 380 kW
Mar 2024
7.4 km away - Solar farm
Burcot Solar FarmApproved, not yet built · 50 MW
Mar 2025
8.2 km away - Battery storage
Burcot Solar FarmApproved, not yet built · 50 MW
Mar 2025
8.2 km away - Battery storage
Appleford - Battery Energy StorageApproved, not yet built · 300 MW
Aug 2025
8.4 km away - Rooftop solar
Chalgrove Airfield, Sir James Martin Way - Solar PanelsApproved, not yet built · 250 kW
Apr 2025
8.8 km away - Rooftop solar
Building M1, Culham Science Centre, Clifton Hampden - Solar PanelsApproved, not yet built · 170 kW
Aug 2022
9.1 km away - Rooftop solar
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
- Major, planned
Castle Street, WallingfordUtility repair and maintenance works · THAMES WATER · Road closure
Jan 2027 to Feb 2027
550 m away - Major
Castle Street, WallingfordUtility repair and maintenance works · THAMES WATER · Road closure
Jan 2027 to Feb 2027
550 m away - Major
High Street, WallingfordUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due November 2026
15.8 km away - Decision
Botley West Solar FarmGenerating Stations · Land in West Oxfordshire, Cherwell and Vale of White Horse Districts, across approx 1400 hectares application due by 15 November 2024
27.8 km away - Decideddecided Sept 2016
29.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Culham Science Centre, Building E4, E5 & E6, Clifton Hampden - Solar PanelsApproved, not yet built · 190 kW
Running nearest: Winterbrook (solar farm, 1.7 km); Wallingford (Waste AD) (anaerobic digestion, 1.9 km); Crowmarsh Battle Farm (Farm AD) (anaerobic digestion, 2.2 km); Wally Corner Landfill Site (solar farm, 6.5 km); Langley Hall Farm (solar farm, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.