Country England and Wales › Region North West › Council Tameside › Neighbourhood Smallshaw › Postcode OL7 9DA What's changing near OL7 9DA Within 2 km, around Smallshaw in Tameside. Building, planning, schools, transport, prices and crime.
73 new homes completed within 2 km, last 2 years
227 homes given permission on brownfield sites since 2021
-3.2% like-for-like prices in Smallshaw, 2024 → 2025 (council +4.6%)
– crime data not published here (Greater Manchester)
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 31 new homes completed houses · May 2025 – Oct 2026
Oct 2026 1.6 km away New homes 6 new homes completed flats · Apr 2026
Apr 2026 450 m away New homes 10 new homes completed flats · Jun 2025 – Sep 2025
Sept 2025 950 m away New school Aug 2025 1.4 km away New homes 8 new homes completed flats · Jun 2025
Jun 2025 950 m away New homes 7 new homes completed flats · Jun 2025
Jun 2025 700 m away School closed School closed: Greater Manchester Alternative Provision Other independent special school, other independent special school (closure)
Jun 2025 750 m away Planning permission Apr 2025 1.0 km away Planning permission Jul 2024 900 m away Planning permission 17 homes extended 2021–2025, typically adding 25 m²
49 since energy certificates began (2008)
2 in OL7 9DA itself
Extended certificate 2016 Extended certificate 2013 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 13 storm overflows within 2 km
1,246 hours of spills in 2025 between them (typical neighbourhood: about 36)
427 spill events counted
United Utilities 250m Of Ashton Road Bardsley Ps Cso into River Medlock 30 spills, 305 hours in 2025
1.5 km away United Utilities Turner Lane/Alexandra Road Cso into The River Tame 77 spills, 208 hours in 2025
1.1 km away United Utilities Wharf Street Cso 44184 into River Tame 59 spills, 202 hours in 2025
1.6 km away United Utilities Broadoak Road Cso (44018) into Taunton (Smallshaw Beck) 55 spills, 137 hours in 2025
700 m away United Utilities Lower Wharf St/Scotland St Cso into River Tame 60 spills, 111 hours in 2025
1.3 km away United Utilities Lower Wharf Street Cso 442ec into River Tame 66 spills, 103 hours in 2025
1.2 km away United Utilities Newmarket Road Ps into Taunton Brook, Trib Of Medlock 33 spills, 87 hours in 2025
1.1 km away United Utilities Coal Pit Lane Cso into River Medlock Via Sws 15 spills, 43 hours in 2025
1.5 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 67 planned, approved or being built and 12 running (70 MW between them). Those within 5 km are on the map above.
Rooftop solar Burlington Street - Solar PV Panels Approved, not yet built · 910 kW
Jan 2024 1.1 km away Rooftop solar Tameside College, Beaufort Road - Solar Panels Approved, not yet built · 400 kW
Sept 2025 1.5 km away Rooftop solar Tameside General Hospital, Fountain Street - Solar Panels Planning application in · 310 kW
Jun 2026 2.0 km away Other Tameside General Hospital - Energy Centre Planning application in · 2 MW
May 2026 2.0 km away Rooftop solar Laurus Ryecroft High School, Lumb Lane - Solar Panels Approved, not yet built · 270 kW
Sept 2025 2.0 km away Battery storage Holden Way Approved, not yet built · 6 MW
Jun 2018 2.0 km away Landfill gas Tame Power - Flexible Energy Facility Approved, not yet built · 5 MW
Dec 2024 2.3 km away Battery storage Tame Box, Tame Street - Battery Storage Approved, not yet built · 200 kW
Oct 2022 2.6 km away Battery storage Tudor Industrial Estate, Ashton Street- Micro Energy Storage Approved, not yet built · 200 kW
Sept 2025 2.7 km away Battery storage Medlock Road, Failsworth - Battery Energy Storage Approved, not yet built · 30 MW
Oct 2025 3.0 km away Road and street works within 1 km 6 permitted works running now or planned, 2 of them major.
Major, planned Oldham Road, Ashton-Under-Lyne Utility repair and maintenance works · SP Electricity North West · Lane closure
Oct 2026 to Oct 2026 850 m away Major Oldham Road, Ashton-Under-Lyne Utility repair and maintenance works · SP Electricity North West · Lane closure
Oct 2026 to Oct 2026 850 m away Standard Knowle Avenue, Ashton-Under-Lyne Disconnection or alteration of supply · TAMESIDE METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026 100 m away Standard Ripon Street, Ashton-Under-Lyne Disconnection or alteration of supply · TAMESIDE METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026 1000 m away Minor Langham Street, Ashton-Under-Lyne Utility asset works · Cornerstone Telecommunications Infrastructure Limited · No carriageway incursion
Nov 2026 to Nov 2026 400 m away Minor Ney Street, Ashton-Under-Lyne Utility asset works · BT · Give and take
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Nov 2022 7.5 km away Decided decided Sept 2025 12.2 km away Decided decided Aug 2014 26.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Godley Water Treatment Works (solar farm, 5.2 km); Reliance Street Mechanical Biological Treatment Facility (MBT) (anaerobic digestion, 5.4 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 5.5 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 6.1 km); The National Cycling Centre Velodrome (rooftop solar, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.