Country England and Wales › Region North West › Council Tameside › Neighbourhood Ashton East › Postcode OL6 6RG What's changing near OL6 6RG Within 2 km, around Ashton East in Tameside. Building, planning, schools, transport, prices and crime.
122 new homes completed within 2 km, last 2 years
274 homes given permission on brownfield sites since 2021
+3.0% like-for-like prices in Ashton East, 2024 → 2025 (council +4.6%)
– crime data not published here (Greater Manchester)
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 31 new homes completed houses · May 2025 – Oct 2026
Oct 2026 1.0 km away New homes 5 new homes completed flats · Jul 2025 – Jan 2026
Jan 2026 850 m away New homes 10 new homes completed flats · Jun 2025 – Sep 2025
Sept 2025 1.3 km away New school Aug 2025 1.1 km away New school Jun 2025 1.3 km away New homes 8 new homes completed flats · Jun 2025
Jun 2025 1.0 km away New homes 7 new homes completed flats · Jun 2025
Jun 2025 1.2 km away School closed School closed: Greater Manchester Alternative Provision Other independent special school, other independent special school (closure)
Jun 2025 1.9 km away Planning permission Apr 2025 1.2 km away New homes 18 new homes completed flats · Dec 2024 – Feb 2025
Feb 2025 1.5 km away 11 homes extended 2021–2025, typically adding 27 m²
26 since energy certificates began (2008)
1 in OL6 6RG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 22 storm overflows within 2 km
1,266 hours of spills in 2025 between them (typical neighbourhood: about 36)
516 spill events counted
United Utilities Corporation Street into River Tame 75 spills, 215 hours in 2025
1.5 km away United Utilities Turner Lane/Alexandra Road Cso into The River Tame 77 spills, 208 hours in 2025
1.2 km away United Utilities Wharf Street Cso 44184 into River Tame 59 spills, 202 hours in 2025
1.8 km away United Utilities Tame Street/Park Road Cso into River Tame 50 spills, 178 hours in 2025
900 m away United Utilities Broadoak Road Cso (44018) into Taunton (Smallshaw Beck) 55 spills, 137 hours in 2025
1.7 km away United Utilities Lower Wharf St/Scotland St Cso into River Tame 60 spills, 111 hours in 2025
1.0 km away United Utilities Lower Wharf Street Cso 442ec into River Tame 66 spills, 103 hours in 2025
1.1 km away United Utilities Tbc into River Tame 53 spills, 69 hours in 2025
1.7 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 57 planned, approved or being built and 12 running (70 MW between them). Those within 5 km are on the map above.
Rooftop solar Tameside College, Beaufort Road - Solar Panels Approved, not yet built · 400 kW
Sept 2025 350 m away Rooftop solar Tameside General Hospital, Fountain Street - Solar Panels Planning application in · 310 kW
Jun 2026 450 m away Other Tameside General Hospital - Energy Centre Planning application in · 2 MW
May 2026 450 m away Battery storage Holden Way Approved, not yet built · 6 MW
Jun 2018 650 m away Landfill gas Tame Power - Flexible Energy Facility Approved, not yet built · 5 MW
Dec 2024 700 m away Battery storage Tame Box, Tame Street - Battery Storage Approved, not yet built · 200 kW
Oct 2022 1.0 km away Battery storage Printworks Road - Stalybridge Battery Storage Approved, not yet built · 150 MW
Dec 2023 2.2 km away Rooftop solar Burlington Street - Solar PV Panels Approved, not yet built · 910 kW
Jan 2024 2.3 km away Battery storage Tudor Industrial Estate, Ashton Street- Micro Energy Storage Approved, not yet built · 200 kW
Sept 2025 2.7 km away Rooftop solar Concordia - Solar Panels Approved, not yet built · 240 kW
Jan 2024 3.3 km away Battery storage Road and street works within 1 km 24 permitted works running now or planned, 3 of them major.
Major Hulme Street, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 750 m away Major Cottingham Drive, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Dec 2026 900 m away Major Lower Green, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 950 m away Standard Dysart Street, Ashton-Under-Lyne New service connection · LAST MILE ELECTRICITY LIMITED (Formerly GLOBAL UTILITY CONNECTIONS) · Multi-way signals
Oct 2026 to Nov 2026 300 m away Standard Rutland Street, Ashton-Under-Lyne New service connection · LAST MILE ELECTRICITY LIMITED (Formerly GLOBAL UTILITY CONNECTIONS) · Multi-way signals
Oct 2026 to Nov 2026 300 m away Standard Mossley Road Icw Herries Street, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Nov 2026 600 m away Standard Herries Street, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 600 m away Standard Princess Street Part 2, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Nov 2026 650 m away Standard Hope Street, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Major infrastructure projects within 30 km Decided decided Nov 2022 5.7 km away Decided decided Sept 2025 14.1 km away Decided decided Aug 2014 27.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Godley Water Treatment Works (solar farm, 3.8 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 5.8 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 7.2 km); Reliance Street Mechanical Biological Treatment Facility (MBT) (anaerobic digestion, 7.2 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.