Country England and Wales › Region North West › Council Tameside › Neighbourhood Ashton East › Postcode OL6 6NN What's changing near OL6 6NN Within 2 km, around Ashton East in Tameside. Building, planning, schools, transport, prices and crime.
91 new homes completed within 2 km, last 2 years
312 homes given permission on brownfield sites since 2021
+3.0% like-for-like prices in Ashton East, 2024 → 2025 (council +4.6%)
– crime data not published here (Greater Manchester)
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 31 new homes completed houses · May 2025 – Oct 2026
Oct 2026 1.1 km away New homes 6 new homes completed flats · Apr 2026
Apr 2026 1.7 km away New homes 5 new homes completed flats · Jul 2025 – Jan 2026
Jan 2026 1.4 km away New homes 10 new homes completed flats · Jun 2025 – Sep 2025
Sept 2025 750 m away New school Aug 2025 650 m away New school Jun 2025 1.8 km away New homes 8 new homes completed flats · Jun 2025
Jun 2025 450 m away New homes 7 new homes completed flats · Jun 2025
Jun 2025 700 m away School closed School closed: Greater Manchester Alternative Provision Other independent special school, other independent special school (closure)
Jun 2025 1.3 km away Planning permission Apr 2025 650 m away 15 homes extended 2021–2025, typically adding 26 m²
32 since energy certificates began (2008)
0 in OL6 6NN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 19 storm overflows within 2 km
1,003 hours of spills in 2025 between them (typical neighbourhood: about 36)
408 spill events counted
United Utilities Turner Lane/Alexandra Road Cso into The River Tame 77 spills, 208 hours in 2025
650 m away United Utilities Wharf Street Cso 44184 into River Tame 59 spills, 202 hours in 2025
1.4 km away United Utilities Tame Street/Park Road Cso into River Tame 50 spills, 178 hours in 2025
1.2 km away United Utilities Broadoak Road Cso (44018) into Taunton (Smallshaw Beck) 55 spills, 137 hours in 2025
1.3 km away United Utilities Lower Wharf St/Scotland St Cso into River Tame 60 spills, 111 hours in 2025
550 m away United Utilities Lower Wharf Street Cso 442ec into River Tame 66 spills, 103 hours in 2025
550 m away United Utilities Gambrel Bank Road Cso 441u7 into Downshaw Brook 22 spills, 24 hours in 2025
1.9 km away United Utilities Rassbottom Street Cso into River Tame 3 spills, 12 hours in 2025
1.4 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 61 planned, approved or being built and 12 running (70 MW between them). Those within 5 km are on the map above.
Rooftop solar Tameside College, Beaufort Road - Solar Panels Approved, not yet built · 400 kW
Sept 2025 200 m away Battery storage Holden Way Approved, not yet built · 6 MW
Jun 2018 800 m away Rooftop solar Tameside General Hospital, Fountain Street - Solar Panels Planning application in · 310 kW
Jun 2026 900 m away Other Tameside General Hospital - Energy Centre Planning application in · 2 MW
May 2026 900 m away Landfill gas Tame Power - Flexible Energy Facility Approved, not yet built · 5 MW
Dec 2024 1.0 km away Battery storage Tame Box, Tame Street - Battery Storage Approved, not yet built · 200 kW
Oct 2022 1.3 km away Rooftop solar Burlington Street - Solar PV Panels Approved, not yet built · 910 kW
Jan 2024 1.7 km away Battery storage Tudor Industrial Estate, Ashton Street- Micro Energy Storage Approved, not yet built · 200 kW
Sept 2025 2.3 km away Battery storage Printworks Road - Stalybridge Battery Storage Approved, not yet built · 150 MW
Dec 2023 2.8 km away Rooftop solar Laurus Ryecroft High School, Lumb Lane - Solar Panels Approved, not yet built · 270 kW
Sept 2025 3.2 km away Road and street works within 1 km 22 permitted works running now or planned, 3 of them major.
Major Cottingham Drive, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Dec 2026 600 m away Major Hulme Street, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 600 m away Major Lower Green, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 650 m away Standard Ripon Street, Ashton-Under-Lyne Disconnection or alteration of supply · TAMESIDE METROPOLITAN BOROUGH COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026 350 m away Standard Dysart Street, Ashton-Under-Lyne New service connection · LAST MILE ELECTRICITY LIMITED (Formerly GLOBAL UTILITY CONNECTIONS) · Multi-way signals
Oct 2026 to Nov 2026 500 m away Standard Herries Street, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 500 m away Standard Mossley Road Icw Herries Street, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Nov 2026 500 m away Standard Holden Street Pt 1, Ashton-Under-Lyne Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Dec 2026 500 m away Standard Rutland Street, Ashton-Under-Lyne New service connection · LAST MILE ELECTRICITY LIMITED (Formerly GLOBAL UTILITY CONNECTIONS) · Multi-way signals
Major infrastructure projects within 30 km Decided decided Nov 2022 6.2 km away Decided decided Sept 2025 13.5 km away Decided decided Aug 2014 26.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Godley Water Treatment Works (solar farm, 4.0 km); Denton Hall Farm Road, Denton - Solar Photovoltaic System (rooftop solar, 5.5 km); Reliance Street Mechanical Biological Treatment Facility (MBT) (anaerobic digestion, 6.6 km); Tesco Super-Store (Garratt Way, Gorton) (rooftop solar, 6.6 km); Bredbury Park Way - AD Stockport (Waste AD) (anaerobic digestion, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.