Country England and Wales › Region North West › Council Oldham › Neighbourhood Clough & Shaw Side › Postcode OL2 7EY What's changing near OL2 7EY Within 2 km, around Clough & Shaw Side in Oldham. Building, planning, schools, transport, prices and crime.
214 new homes completed within 2 km, last 2 years
440 homes given permission on brownfield sites since 2021
+8.9% like-for-like prices in Clough & Shaw Side, 2024 → 2025 (council +6.4%)
– crime data not published here (Greater Manchester)
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 14 new homes completed houses · Feb 2026 – Oct 2026
Oct 2026 1.7 km away New homes 16 new homes completed houses · Jan 2025 – Oct 2026
Oct 2026 700 m away New homes 6 new homes completed houses · Dec 2024 – Sep 2026
Sept 2026 1.1 km away New homes 18 new homes completed houses · Jan 2026 – Aug 2026
Aug 2026 700 m away New homes 45 new homes completed houses · Mar 2025 – Jun 2026
Jun 2026 1.1 km away New homes 11 new homes completed houses · Mar 2025 – May 2026
May 2026 1000 m away New homes 23 new homes completed houses · Mar 2025 – Dec 2025
Dec 2025 1.0 km away New homes 42 new homes completed houses · Mar 2025 – Dec 2025
Dec 2025 950 m away New homes 20 new homes completed houses · Mar 2025 – Oct 2025
Oct 2025 650 m away New homes 12 new homes completed houses · Oct 2024 – Mar 2025
Mar 2025 700 m away Planning permission Apr 2024 1.1 km away New school 20 homes extended 2021–2025, typically adding 29 m²
32 since energy certificates began (2008)
2 in OL2 7EY itself
Extended certificate 2026 Extended certificate 2025 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
15 hours of spills in 2025 between them (typical neighbourhood: about 36)
8 spill events counted
United Utilities Cowlishaw Cso into Luzley Brook 4 spills, 10 hours in 2025
650 m away United Utilities Fir Lane Combined Sewer Overflow into Unnamed Tributary Of River Irk 4 spills, 5 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 43 planned, approved or being built and 2 running (5 MW between them). Those within 5 km are on the map above.
Battery storage Ellenroad Farm, Bentgate Street - Battery Energy Storage System Approved, not yet built · 30 MW
Mar 2025 2.5 km away Battery storage Dig Gate Lane - Battery Energy Storage Approved, not yet built
Apr 2025 2.5 km away Rooftop solar Oldham Athletic Football Club, Hilbre Avenue - Solar Panels Approved, not yet built · 380 kW
Oct 2025 3.0 km away Rooftop solar Molnlycke Healthcare, Brook Street - Solar Panels Approved, not yet built · 470 kW
Mar 2023 3.6 km away Rooftop solar Manor Mill, Victoria Street - Solar Panels Approved, not yet built · 520 kW
Dec 2022 3.8 km away Rooftop solar Featherstall Road Tesco (Chadderton) Approved, not yet built · 500 kW
Mar 2020 3.8 km away Rooftop solar Tesco Stores, Featherstall Road North - Roof Mounted Solar Panels Approved, not yet built · 420 kW
Jul 2023 3.8 km away Rooftop solar Sainsburys Supermarkets, Union Street - Solar Panels Approved, not yet built · 370 kW
Apr 2026 4.2 km away Rooftop solar Inkech, Crawford Street - Solar Panels Approved, not yet built · 210 kW
Jul 2025 4.2 km away Battery storage Bentfield Industrial Units Approved, not yet built · 300 kW
May 2020 4.5 km away Road and street works within 1 km 13 permitted works running now or planned, 5 of them major.
Major, planned Surrey Avenue, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Give and take
Nov 2026 to Jan 2027 350 m away Major, planned Bedford Avenue, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Mar 2027 to Apr 2027 350 m away Major, planned Dorset Avenue, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Give and take
Feb 2027 to Mar 2027 450 m away Major, planned Alwin Road, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Mar 2027 to Mar 2027 900 m away Major, planned Ingleby Close, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Mar 2027 to Apr 2027 950 m away Standard Devon Close, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Apr 2027 to May 2027 350 m away Standard Norfolk Close, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
May 2027 to May 2027 350 m away Standard Hereford Close, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Jan 2027 to Jan 2027 450 m away Standard Warwick Close, Shaw Utility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Major infrastructure projects within 30 km Decided decided Sept 2025 10.8 km away Decided decided Nov 2022 14.7 km away Pre-application Calderdale Energy Park Generating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026 25.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Scouthead Power Plant (landfill gas, 5.0 km); Reliance Street Mechanical Biological Treatment Facility (MBT) (anaerobic digestion, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.