Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
597hours of spills in 2025 between them (typical neighbourhood: about 36)
254spill events counted
United Utilities
Smith Bridge Road Cso 35051into River Roch20 spills, 159 hours in 2025
700 m away
United Utilities
Albert Royds Street Csointo River Roch73 spills, 139 hours in 2025
1.3 km away
United Utilities
Belfield Road/Beswicke Royds St Csointo Sanney Brook40 spills, 93 hours in 2025
1.6 km away
United Utilities
Millgate Cso 35025into River Roch26 spills, 53 hours in 2025
900 m away
United Utilities
Oakcliffe Road Csointo Culverted Trib Of River Roch26 spills, 52 hours in 2025
850 m away
United Utilities
Yorkshire St Oswald St Cso 35024into Hey Brook Trib Of River Roch31 spills, 51 hours in 2025
1.9 km away
United Utilities
Waterhouse Close (Wardle) Csointo Ash Brook20 spills, 23 hours in 2025
1.1 km away
United Utilities
Albert Royds Street Csointo River Roch2 spills, 14 hours in 2025
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Littleborough South & Smithy Bridge: +32% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.8% in two years.