Country England and Wales › Region North West › Council Rochdale › Neighbourhood Littleborough North & Calderbook › Postcode OL15 9EG What's changing near OL15 9EG Within 2 km, around Littleborough North & Calderbook in Rochdale. Building, planning, schools, transport, prices and crime.
75 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+10.2% like-for-like prices in Littleborough North & Calderbook, 2024 → 2025 (council +4.9%)
– crime data not published here (Greater Manchester)
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 33 new homes completed houses · Dec 2024 – Jun 2026
Jun 2026 1.3 km away New homes 8 new homes completed houses · Dec 2025 – Mar 2026
Mar 2026 1.3 km away New homes 18 new homes completed 2 flats, 16 houses · Dec 2024 – Dec 2025
Dec 2025 1.5 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 27 m²
9 since energy certificates began (2008)
1 in OL15 9EG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 12 planned, approved or being built and 4 running (60 MW between them). Those within 5 km are on the map above.
Rooftop solar Corrosion Resistant Products, Todmorden Road - Solar Panels Approved, not yet built · 260 kW
Feb 2025 0 m away Rooftop solar Makin Metal Powders Limited, Buckley Road - Solar Panels Approved, not yet built · 650 kW
Sept 2023 4.0 km away Rooftop solar Inkech, Crawford Street - Solar Panels Approved, not yet built · 210 kW
Jul 2025 5.5 km away Battery storage Ellenroad Farm, Bentgate Street - Battery Energy Storage System Approved, not yet built · 30 MW
Mar 2025 5.6 km away Battery storage Dig Gate Lane - Battery Energy Storage Approved, not yet built
Apr 2025 6.2 km away Rooftop solar Spotland Stadium, Sandy Lane - Solar Panels Approved, not yet built · 150 kW
Dec 2024 6.8 km away Rooftop solar Sandholme Iron Works, Halifax Road - Solar Panels Approved, not yet built · 830 kW
Feb 2024 7.4 km away Rooftop solar Norden Community School - Solar PV Systems Approved, not yet built · 160 kW
Aug 2021 8.0 km away Battery storage Gipsy Lane Being built · 20 MW
Jul 2021 8.1 km away Battery storage Astra Centre, Royal Barn Road - Energy Storage Being built · 40 MW
Feb 2024 8.2 km away Battery storage Road and street works within 1 km 3 permitted works running now or planned.
Standard Todmorden Road, Littleborough New service connection · SP Electricity North West · Two-way signals
Oct 2026 to Oct 2026 600 m away Standard Calderbrook Road, Littleborough New service connection · SP Electricity North West · Two-way signals
Oct 2026 to Oct 2026 800 m away Minor Church Street, Littleborough Remedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 15.7 km away Pre-application Calderdale Energy Park Generating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026 17.2 km away Decided decided Nov 2022 21.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Crook Hill (Calderdale MBC) 1 of 2 (wind farm, 2.5 km); Crook Hill (Rochdale MBC) 2 of 2 (wind farm, 2.9 km); Todmorden Moor (wind farm, 7.3 km); Reaps Moss Wind Farm (wind farm, 7.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.