Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
90hours of spills in 2025 between them (typical neighbourhood: about 36)
54spill events counted
United Utilities
Newchurch Road/Wesley Place Csointo River Irwell32 spills, 63 hours in 2025
1.7 km away
United Utilities
Hammertonstreet/Stanley Street Csointo River Irwell9 spills, 9 hours in 2025
500 m away
United Utilities
Burnley Road Bacup Csointo River Irwell1 spills, 9 hours in 2025
500 m away
United Utilities
Newchurch Road Bacup Csointo River Irwell4 spills, 7 hours in 2025
2.0 km away
United Utilities
Lee Road Cso (369ba)into River Irwell1 spills, 1 hours in 2025
2.0 km away
United Utilities
Rockliffe Road/River Street Csointo River Irwell3 spills, 1 hours in 2025
1.2 km away
United Utilities
South Street/Pickup Street Csointo River Irwell4 spills, 1 hours in 2025
650 m away
United Utilities
Tong Lane/Reed Street Csointo Gleave Clough Brook0 spills, 0 hours in 2025
10 planned, approved or being built and 12 running (158 MW between them). Those within 5 km are on the map above.
Battery storage
Park Road Battery StorageApproved, not yet built · 10 MW
Nov 2021 1.5 km away
Solar farm
Coal Clough Wind Farm (Co-located)Planning application in · 10 MW
Sept 2019 5.5 km away
Rooftop solar
Sandholme Iron Works, Halifax Road - Solar PanelsApproved, not yet built · 830 kW
Feb 2024 7.3 km away
Battery storage
Former Bull & Butcher Pub - Battery Energy StorageApproved, not yet built
Jul 2023 8.1 km away
Rooftop solar
Norden Community School - Solar PV SystemsApproved, not yet built · 160 kW
Aug 2021 9.1 km away
Rooftop solar
Makin Metal Powders Limited, Buckley Road - Solar PanelsApproved, not yet built · 650 kW
Sept 2023 9.1 km away
Solar farm
Paragon Works, Rising Bridge Road - Solar FarmApproved, not yet built · 1 MW
Apr 2025 9.5 km away
Rooftop solar
Corrosion Resistant Products, Todmorden Road - Solar PanelsApproved, not yet built · 260 kW
Feb 2025 9.6 km away
Rooftop solar
Spotland Stadium, Sandy Lane - Solar PanelsApproved, not yet built · 150 kW
Dec 2024 10.0 km away
Energy from waste
Hapton Valley Transfer Station, Accrington Road - Combined Heat And PowerApproved, not yet built
Nov 2023 10.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Bacup: +50% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.4% in two years.