Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
1,781hours of spills in 2025 between them (typical neighbourhood: about 36)
277spill events counted
United Utilities
The Glen Combined Sewer Overflowinto River Irwell139 spills, 1,306 hours in 2025
1.8 km away
United Utilities
Newchurch Road Cso (36013)into River Irwell27 spills, 226 hours in 2025
1.3 km away
United Utilities
Newchurch Road/Brooks Street Csointo River Irwell58 spills, 152 hours in 2025
400 m away
United Utilities
Newchurch Road/Wesley Place Csointo River Irwell32 spills, 63 hours in 2025
900 m away
United Utilities
Waterbarn Lane Csointo River Irwell7 spills, 22 hours in 2025
1.4 km away
United Utilities
Newchurch Road Bacup Csointo River Irwell4 spills, 7 hours in 2025
600 m away
United Utilities
Blackwood Road Csointo River Irwell2 spills, 3 hours in 2025
600 m away
United Utilities
Lee Road Cso (369ba)into River Irwell1 spills, 1 hours in 2025
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Waterfoot & Stacksteads: +43% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.1% in two years.