What's changing near OL12 7JW
Within 2 km, around Hooley Bridge & Norden West in Rochdale. Building, planning, schools, transport, prices and crime.
77new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.4%like-for-like prices in Hooley Bridge & Norden West, 2024 → 2025 (council +4.9%)
–crime data not published here (Greater Manchester)
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
49 new homes completedhouses · Sep 2025 – Jun 2026
Jun 2026
1.0 km away - New homes
11 new homes completedhouses · Dec 2024 – May 2025
May 2025
2.0 km away - New homes
9 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025
1.9 km away - New school
New school: Spotland Primary AcademyAcademy sponsor led, primary
Apr 2025
1.8 km away - New schoolJul 2024
1.5 km away - New schoolAug 2022
200 m away - New school
New school: Oulder Hill Leadership AcademyAcademy sponsor led, secondary
Mar 2022
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 26 m²
23since energy certificates began (2008)
1in OL12 7JW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
367hours of spills in 2025 between them (typical neighbourhood: about 36)
97spill events counted
- United Utilities
Footwood / Spodden Valley Csointo River Spodden, Trib River Roch35 spills, 219 hours in 2025
1.4 km away - United Utilities
Spotland Bridge Cso 35035into River Spodden51 spills, 128 hours in 2025
1.7 km away - United Utilities
Rooley Moor Rd W51into Trib Healey Dell7 spills, 9 hours in 2025
800 m away - United Utilities
Station Road (Whitworth) Csointo River Spodden2 spills, 7 hours in 2025
1.4 km away - United Utilities
Edenfield Road Csointo Naden Brook1 spills, 4 hours in 2025
1.7 km away - United Utilities
745 Edenfield Road Csointo Naden Brook Trib Of R Roch1 spills, 0 hours in 2025
1.7 km away - United Utilities
Mellor Street Csointo River Spodden0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 11 running (158 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Norden Community School - Solar PV SystemsApproved, not yet built · 160 kW
Aug 2021
1.1 km away - Rooftop solar
Spotland Stadium, Sandy Lane - Solar PanelsApproved, not yet built · 150 kW
Dec 2024
1.6 km away - Battery storage
The Rake, Lower Jowkin Lane - Battery Energy StorageApproved, not yet built · 57 MW
Apr 2024
2.2 km away - Rooftop solar
Makin Metal Powders Limited, Buckley Road - Solar PanelsApproved, not yet built · 650 kW
Sept 2023
3.1 km away - Battery storage
Gipsy LaneBeing built · 20 MW
Jul 2021
3.9 km away - Battery storage
Astra Centre, Royal Barn Road - Energy StorageBeing built · 40 MW
Feb 2024
4.0 km away - Rooftop solar
Inkech, Crawford Street - Solar PanelsApproved, not yet built · 210 kW
Jul 2025
4.3 km away - Rooftop solar
Heywood Sports Village - Solar PanelsApproved, not yet built · 150 kW
Aug 2021
4.7 km away - Solar farm
Chamber HouseBeing built · 4 MW
Apr 2023
4.9 km away - Battery storage
Dig Gate Lane - Battery Energy StorageApproved, not yet built
Apr 2025
5.9 km away - Battery storage
Ellenroad Farm, Bentgate Street - Battery Energy Storage System
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Sept 2025
10.2 km away - Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
21.0 km away - Decideddecided Nov 2022
22.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Scout Moor Windfarm (wind farm, 6.5 km); Crook Hill (Calderdale MBC) 1 of 2 (wind farm, 6.6 km); Crook Hill (Rochdale MBC) 2 of 2 (wind farm, 6.6 km); Pilsworth Quarry Landfill Scheme (landfill gas, 7.0 km); Reaps Moss Wind Farm (wind farm, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.