What's changing near OL10 2PF
Within 2 km, around Heywood Hopwood & Siddal Moor in Rochdale. Building, planning, schools, transport, prices and crime.
240new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.9%like-for-like prices in Heywood Hopwood & Siddal Moor, 2024 → 2025 (council +4.9%)
–crime data not published here (Greater Manchester)
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
15 new homes completedhouses · Jul 2025 – Oct 2026
planned Oct 2026
1.1 km away - New homes
25 new homes completedhouses · Mar 2025 – Sep 2026
Sept 2026
1.3 km away - New homes
10 new homes completedhouses · Jun 2025 – Aug 2026
Aug 2026
1.3 km away - New homes
14 new homes completedhouses · Sep 2025 – Aug 2026
Aug 2026
1.2 km away - New homes
7 new homes completedhouses · Jul 2025 – Jul 2026
Jul 2026
1.1 km away - New homes
17 new homes completedhouses · Nov 2024 – Jul 2026
Jul 2026
1.3 km away - New homes
15 new homes completedhouses · Jan 2026 – Jun 2026
Jun 2026
800 m away - New homes
8 new homes completed1 flats, 7 houses · Mar 2026 – Jun 2026
Jun 2026
850 m away - New homes
14 new homes completedflats · Jun 2026
Jun 2026
1.3 km away - New homes
45 new homes completed19 flats, 26 houses · Mar 2026 – Apr 2026
Apr 2026
800 m away - New homes
40 new homes completedflats · Dec 2025
Dec 2025
1.4 km away - New homes
8 new homes completedflats · Dec 2025
Dec 2025
800 m away
6homes extended 2021–2025, typically adding 40 m²
12since energy certificates began (2008)
1in OL10 2PF itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
593hours of spills in 2025 between them (typical neighbourhood: about 36)
178spill events counted
- United Utilities
Heywood (Botany Stw) Csointo River Roch35 spills, 241 hours in 2025
1.8 km away - United Utilities
Hooley Bridge Csointo The River Roch39 spills, 140 hours in 2025
1.8 km away - United Utilities
Peel Lane Cso No. 1into River Roch43 spills, 92 hours in 2025
1.6 km away - United Utilities
Peel Lane No 2 Csointo River Roch35 spills, 69 hours in 2025
1.5 km away - United Utilities
Middleton Rd Psinto Whittle Brook5 spills, 32 hours in 2025
1.5 km away - United Utilities
John Street Cso 35020into Millers Brook Via Sws20 spills, 18 hours in 2025
1.3 km away - United Utilities
Middleton Road Csointo Whittle Brook Via Sws1 spills, 0 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
48 planned, approved or being built and 7 running (97 MW between them). Those within 5 km are on the map above.
- Solar farm
Chamber HouseBeing built · 4 MW
Apr 2023
950 m away - Rooftop solar
Heywood Sports Village - Solar PanelsApproved, not yet built · 150 kW
Aug 2021
1.3 km away - Rooftop solar
Heywood Distribution Park, Pilsworth Road - Solar PanelsApproved, not yet built · 150 kW
Apr 2026
1.9 km away - Rooftop solar
Heywood Distribution Park, Pilsworth Road - Solar PanelsApproved, not yet built · 150 kW
May 2026
1.9 km away - Rooftop solar
Hopwood Hall College, Rochdale Road - Solar PanelsPlanning application in · 500 kW
Aug 2024
2.9 km away - Battery storage
Astra Centre, Royal Barn Road - Energy StorageBeing built · 40 MW
Feb 2024
3.2 km away - Battery storage
Gipsy LaneBeing built · 20 MW
Jul 2021
3.3 km away - Rooftop solar
David Lloyd Health Club, Heywood Old Road - Solar PanelApproved, not yet built · 550 kW
Nov 2023
3.4 km away - Rooftop solar
The Food Warehouse Iceland, Pilsworth Road -Solar PanelsApproved, not yet built · 160 kW
Jan 2026
3.4 km away - Rooftop solar
Cardinal Langley RC High School, Rochdale Road - Solar PanelsApproved, not yet built · 360 kW
Sept 2025
3.5 km away - Battery storage
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major, planned
Egerton Street, HeywoodUtility repair and maintenance works · SP Electricity North West · Road closure
Oct 2026 to Nov 2026
550 m away - Minor
Pilsworth Road, HeywoodSection 50 · ROCHDALE BOROUGH COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Sept 2025
4.6 km away - Decideddecided Nov 2022
20.1 km away - Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
26.7 km away - Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027
28.3 km away - Decideddecided Aug 2014
29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Pilsworth Quarry Landfill Scheme (landfill gas, 2.3 km); Pilsworth Landfill Site (other, 3.2 km); Lascar Works (battery storage, 4.9 km); Central Park - Solar photovaltics (rooftop solar, 9.2 km); Clifton Hall (landfill gas, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.