What's changing near NW8 9QT
Within 2 km, around Abbey Road in Westminster. Building, planning, schools, transport, prices and crime.
574new homes completed within 2 km, last 2 years
2,143homes given permission on brownfield sites since 2021
-2.4%like-for-like prices in Abbey Road, 2024 → 2025 (council -1.7%)
+18%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
8 new homes completedflats · Aug 2026
Aug 2026
1.9 km away - New homes
14 new homes completedflats · Jun 2026 – Jul 2026
Jul 2026
900 m away - New homes
68 new homes completedflats · Jun 2026 – Jul 2026
Jul 2026
1.1 km away - New homes
9 new homes completedflats · Jun 2026
Jul 2026
700 m away - New homes
22 new homes completedflats · Jun 2026
Jun 2026
1.7 km away - New homes
48 new homes completedflats · Apr 2026 – Jun 2026
Jun 2026
1.1 km away - New homes
7 new homes completedflats · Jun 2026
Jun 2026
500 m away - New homes
88 new homes completedflats · May 2026
Jun 2026
550 m away - New homes
60 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026
1.5 km away - New homes
20 new homes completedflats · Dec 2025 – Mar 2026
Mar 2026
1.3 km away - New homes
7 new homes completedflats · Feb 2026
Feb 2026
1.6 km away - New homes
19 new homes completed16 flats, 3 houses · Feb 2026
Feb 2026
450 m away - New homes
Planning applications within 500 m
308applications in the last 12 months
155approved · 17 refused
57still being decided
14net new homes in approved schemes since 2023
- No Objection to Proposal (OBS only)
278, Elgin Avenue, W9 1JR1 x Eucalyptus: fellWestminster 25/09093/TCA · All Other
350 m away - Application Under Consideration
25, Grove End Road, NW8 9BPT7 1 x sycamore: fell T10 1 x sycamore: fellWestminster 26/06833/TDD · All Other
Oct 2026
500 m away - Application Under Consideration
110, Maida Vale, W9 1PS110 Maida ValeWestminster 26/06872/TCA · All Other
Oct 2026
250 m away - Application Under Consideration
98, Clifton Hill, NW8 0JT98 Clifton Hill London NW8 0JTWestminster 26/06841/FULL · All Other
Oct 2026
400 m away - Application Under Consideration
30, Ashworth Road, W9 1JYInstallation of air source heat pump in rear garden as per Class G - installation or alteration etc of air source heat pumps on domestic premises.Westminster 26/06036/CLEUD · All Other
Oct 2026
450 m away - Application Under Consideration
79, 79 Garden Flat, Hamilton Terrace, NW8 9QXErection of an infill extension within front lightwell and associated alterationsWestminster 26/06799/FULL · All Other
Oct 2026
400 m away - Application Under Consideration
52, Abbey Road, NW8 0QDReplacement of existing garden outbuilding with a similar sized outbuilding in the same location. (Linked with 26/06790/LBC)Westminster 26/06789/FULL · All Other
Oct 2026
450 m away
61homes extended 2021–2025, typically adding 39 m²
131since energy certificates began (2008)
0in NW8 9QT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
84 planned, approved or being built and 1 running (160 kW between them). Those within 5 km are on the map above.
- Rooftop solar
Crompton Street - Solar Photovoltaic ArrayApproved, not yet built · 200 kW
Nov 2021
1.2 km away - Rooftop solar
London Zoo, Outer Circle - Solar PanelsApproved, not yet built · 210 kW
Apr 2025
2.0 km away - Rooftop solar
Moberly Sports Centre - Photovoltaic ArraysApproved, not yet built · 170 kW
Dec 2021
2.2 km away - Rooftop solar
Henderson Court, Fitzjohns Avenue - Solar PanelsApproved, not yet built · 170 kW
Nov 2022
2.5 km away - Other
Windmill Court - CommunityPlanning application in
Jan 2025
2.5 km away - Rooftop solar
Kensington Leisure Centre, Silchester Road - Solar ArrayApproved, not yet built · 170 kW
Feb 2023
3.0 km away - Rooftop solar
Willesden Sports Centre, Donnington Road - Solar PanelsApproved, not yet built · 310 kW
Mar 2025
3.4 km away - Rooftop solar
University College Hospital, Euston Road - Solar PanelsApproved, not yet built · 180 kW
Nov 2022
3.4 km away - Rooftop solar
Kern House, Scrubs Lane - Solar PanelsApproved, not yet built
Sept 2023
3.5 km away - Rooftop solar
Westfield London Shopping Centre, Ariel Way - Solar PanelsPlanning application in · 1 MW
Jun 2023
3.8 km away
Road and street works within 1 km
23 permitted works running now or planned, 12 of them major.
- Major, planned
Maida Vale, LondonHighway repair and maintenance works · LONDON BOROUGH OF CAMDEN · Road closure
Oct 2026 to Oct 2026
450 m away - Major
Kilburn High Road, LondonHighway repair and maintenance works · LONDON BOROUGH OF CAMDEN · Multi-way signals
May 2026 to Oct 2026
500 m away - Major
Finchley Road, LondonStatutory Infrastructure Works · UK POWER NETWORKS EASTERN & LONDON · Multi-way signals
Oct 2026 to Nov 2026
700 m away - Major
Wellington Road, LondonStatutory Infrastructure Works · UK POWER NETWORKS EASTERN & LONDON · Multi-way signals
Oct 2026 to Nov 2026
700 m away - Major
Acacia Road, LondonStatutory Infrastructure Works · UK POWER NETWORKS EASTERN & LONDON · Road closure
Oct 2026 to Nov 2026
700 m away - Major, planned
Cunningham Place, LondonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Dec 2026
850 m away - Major
Cunningham Place, LondonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Sept 2026 to Dec 2026
850 m away - Major, planned
Henderson Drive, LondonUtility asset works · CADENT GAS LIMITED · Give and take
Nov 2026 to Dec 2026
900 m away - Major
Henderson Drive, LondonUtility asset works · CADENT GAS LIMITED · Give and take
Sept 2026 to Nov 2026
900 m away
Major infrastructure projects within 30 km
- Decideddecided Sept 2014
5.6 km away - Decideddecided Apr 2014
12.3 km away - Pre-applicationapplication due March 2027
13.1 km away - Decideddecided Feb 2017
13.8 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
14.0 km away - Pre-applicationapplication due March 2028
14.0 km away - Pre-application
Transport schemes within 20 km
- TransportMay 2022
2.0 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
4.4 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
5.0 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
6.6 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
7.0 km away
Application Under ConsiderationTorridon House, Randolph Gardens, NW6 5HPAmendments to planning permission dated 30th September 2020 (RN:19/09329/COFUL) for Demolition of existing structures including storage sheds and redevelopment of existing car park to provide two blocks of three and five storeys providing a total of 21 x Use Class C3 (residential) units and other associated works, including the provision of storage units, car and cycle parking, landscaping, accessWestminster 26/04909/NMA · All Other
Sept 2026
450 m away DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.